Operating Update: Quarter ended 30 September 2026

Johannesburg, 5 November 2026: Sibanye Stillwater Limited (Sibanye-Stillwater or the Group) (JSE and A2X: SSW; and NYSE: SBSW) (- https://www.commodity-tv.com/play/sibanye-stillwater-focus-on-maximizing-margins-and-operational-efficiency/ -) is pleased to provide an operating update for the quarter ended 30 September 2026. Comparisons include year-on-year (Q3 2026 on Q3 2025), year-to-date (YTD) from 1 January 2026 to 30 September 2026, and Q3 2026 compared with the previous Q2 2026 quarter (quarter-on-quarter or Q3-on-Q2) where appropriate. Group financial results are only provided on a six-monthly basis.

SALIENT FEATURES – QUARTER ENDED 30 SEPTEMBER 2026 (Q3 2026) 

 
  • Quarter-on-Quarter improvement in operating performance across the SA PGM and SA gold operations, steady output at the Century zinc retreatment operation, while the US PGM operations were negatively impacted by industrial action
  • The Group remains on track to meet annual operating guidance with the exception of the US PGM operations following the strike
  • Group adjusted EBITDA increased 9% year-on-year to R10.8 billion (US$662 million), supported by higher commodity prices
  • Continued improvements across key safety metrics quarter-on-quarter and year-to-date
  • Finalisation of the US PGM labour agreement and introduction of team-based incentives represent a significant milestone in the transition to a more productive and sustainable mechanised operating model at the US PGM operations

KEY STATISTICS – GROUP

 
US dollar     SA rand
Quarter ended     Quarter ended
Sep 2025Jun 2026Sep 2026 KEY STATISTICS Sep 2026Jun 2026Sep 2025
    GROUP    
             560              755              662 US$mAdjusted EBITDA1Rm        10,773         12,471           9,872 
          17.64           16.48           16.28 R/US$Average exchange rate using daily closing rate    
           
TABLE OF CONTENTSPage Stock data for the Quarter ended 30 September 2026
     
Key statistics by region2 Number of shares in issue* 
Overview of quarterly operating results 3 - at 30 September 20262,830,567,264
Salient features – operational tables – quarterly statistics6 - weighted average2,830,567,264
All-in cost (reconciliation) – quarters11 Free Float 100 %
Unit operating cost – quarters15 Bloomberg/ReutersSSWSJ/SSWJ.J
Adjusted EBITDA reconciliation – quarters17 JSE Limited - (SSW) 
Non-IFRS measures18 Price range per ordinary share (High/Low)R32.69 to R53.51
Administration and corporate information19 Average daily volume16,073,920
Disclaimer and forward-looking statements20   
   NYSE - (SBSW); one ADR represents four ordinary shares 
   Price range per ADR (High/Low)US$7.67 to US$12.58
   Average daily volume5,315,599
     

* Sibanye-Stillwater's ordinary shares have been listed on the A2X exchange (A2X) in South Africa, with effect from 6 October 2026. Sibanye-Stillwater's primary listing on the JSE Limited, secondary listing of American depositary shares on the New York Stock Exchange, and its issued share capital remain unaffected by the secondary listing on A2X.

KEY STATISTICS BY REGION

 
US dollar     SA rand
Quarter ended     Quarter ended
Sep 2025Jun 2026Sep 2026 KEY STATISTICS Sep 2026Jun 2026Sep 2025
    SOUTHERN AFRICA (SA) OPERATIONS    
    PGM operations    
    493,863     406,406     439,802 oz4E PGM production2,3kg      13,679       12,641      15,361 
        1,839         2,486         2,288 US$/4EozAverage basket priceR/4Eoz      37,250       40,967      32,438 
           281            408            354 US$mAdjusted EBITDA1Rm        5,767         6,758        4,961 
        1,278         1,685         1,634 US$/4EozAll-in sustaining cost1,4R/4Eoz      26,598       27,767      22,537 
    Gold operations    
    175,929     154,259     155,449 ozGold producedkg        4,835         4,798        5,472 
        3,402         4,440         4,219 US$/ozAverage gold priceR/kg 2,208,545  2,352,512  1,929,491 
           212            261            210 US$mAdjusted EBITDA1Rm        3,419         4,290        3,731 
        2,442         3,097         3,189 US$/ozAll-in sustaining cost1,4R/kg 1,668,973  1,640,802  1,385,189 
    INTERNATIONAL OPERATIONS    
    US PGM underground operations    
      73,171       69,544       59,417 oz2E PGM production2,5kg        1,848         2,163        2,276 
        1,184         1,524         1,411 US$/2EozAverage basket priceR/2Eoz      22,971       25,116      20,886 
             33              18              36 US$mAdjusted EBITDA1,6Rm           580            309           579 
        1,165         1,401         1,617 US$/2EozAll-in sustaining cost1,4,6R/2Eoz      26,322       23,093      20,555 
    Recycling operations7    
             26              66              40 US$mAdjusted EBITDA1Rm           652         1,085           475 
    Keliber lithium project    
             (3)             (2)             (9)US$mAdjusted EBITDA1Rm         (153)           (41)           (58)
    Century zinc retreatment operation    
             24              25              25 ktZnPayable zinc production8ktZn             25              25             24 
        2,696         4,177         4,059 US$/tZnAverage equivalent zinc concentrate price9R/tZn      66,085       68,842      47,562 
             28              26              57 US$mAdjusted EBITDA1Rm           925            433           486 
        2,015         2,143         2,520 US$/tZnAll-in sustaining cost1,4R/tZn      41,022       35,323      35,539 
  1. The Group reports adjusted earnings before interest, taxes, depreciation and amortisation (EBITDA) based on the formula included in the facility agreements for compliance with the debt covenant. The Group also reports All-in sustaining costs (AISC) for comparison to similar industry metrics used in the mining industry. See "Non-IFRS measures" for more information on these metrics presented by Sibanye-Stillwater. Adjusted EBITDA may not be comparable to similarly titled measures of other companies. Adjusted EBITDA and AISC are not measures of performance under IFRS Accounting Standards and should be considered in addition to and not as a substitute for any other measure of financial performance and liquidity. The adjusted EBITDA amount in US$m for the quarter ended 30 June 2026 is calculated using the adjusted EBITDA amount in US$m for half-year ended 30 June 2026 less the adjusted EBITDA amount in US$m for the quarter ended 31 March 2026.   For a reconciliation of profit/(loss) before royalties and tax to adjusted EBITDA, see "Adjusted EBITDA reconciliation - Quarters"
  2. The Platinum Group Metals (PGM) production in the SA operations is principally platinum, palladium, rhodium and gold, referred to as 4E (3PGM+Au) and measured at the concentrator, and the US underground operations is principally platinum and palladium, referred to as 2E (2PGM)
  3. The SA PGM production excludes the production associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the production and third party PoC, refer to the "Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Quarters"
  4. See "Salient features and cost benchmarks - Quarter" for the calculation of All-in sustaining cost (AISC). The SA PGM All-in sustaining cost excludes the production and costs associated with third party PoC
  5. The US PGM operations’ underground production is converted to metric tonnes and kilograms, and financial performance is translated to SA rand (Rand)
  6. The Section 45X Advance Manufacturing Production Credits relating to US PGM underground operations for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 were R186 million (US$11 million), R228 million(US$14 million) and R181 million (US$10 million) respectively  
  7. Recycling operations includes Reldan Pennsylvania (PA), Metallix North Carolina (NC) and Montana recycling sites. The acquisition of the NC site was concluded on 4 September 2025 and financial results were included from the quarter ended 31 December 2025.
  8. Payable zinc production is the payable quantity of zinc metal produced after applying smelter content deductions
  9. Average equivalent zinc concentrate price is the total zinc sales revenue recognised at the price expected to be received excluding the fair value adjustments divided by the payable zinc sales

 

STATEMENT BY RICHARD STEWART, CHIEF EXECUTIVE OFFICER OF SIBANYE-STILLWATER 

 

The Group continued to make progress on its strategic priorities during Q3 2026, delivering encouraging safety improvements, consistent operating results and a significantly stronger financial position. Supported by higher commodity prices and stable operational performance from the SA PGM, SA gold, Recycling and Century zinc retreatment operations, adjusted EBITDA increased by 9% year-on-year to R10.8 billion (US$662 million). The Group remains on track to achieve annual operating guidance for 2026, with the exception of the US PGM operations, where production and cost guidance has been revised to reflect the impact of the approximate five-week strike. At the Keliber lithium project, mining and hot commissioning of the concentrator continued during the quarter, resulting in the increased build-up of the ore stockpile of 330kt while ongoing improvements were achieved in concentrator throughput and spodumene specification.

Q3 2026 saw continued improvements in the Group's injury-frequency metrics, including year-on-year reductions in both serious and total reportable injuries. Key milestones included one year fatality-free at Driefontein. The Group serious injury frequency rate (SIFR) per million hours worked improved year-on-year to 1.82 from 2.31 for Q3 2025, while sustained near-miss incident reporting strengthened risk awareness, operational transparency and confidence in the incident reporting process. The quarter was however marred by the tragic loss of two colleagues at our Beatrix operations. Mr Lwandile Kohliso, was found deceased underground on 21 September 2026 and Mr Chinonge Kalie a protection services officer was fatally injured in a shooting involving illegal miners on 23 July 2026. The Board and management extend our sincere condolences to the families and friends of Mr Kohliso and Mr Kalie.

Disciplined investment in organic growth projects requires focused execution. Production at the Marikana K4 shaft continues to ramp-up successfully, and the Siphumelele and Thembelani extension projects are progressing on schedule. The Mt Lyell and Burnstone projects have advanced to the execution stage, with the necessary planning, mobilisation and preparatory work now underway to support successful project delivery.

Further details are provided in the safe production and operational review sections of this Q3 2026 operating update.

Following the approximately five-week strike at the Stillwater operations and Columbus processing facilities, the four month long US PGM negotiations concluded in early October 2026. I would like to thank the Stillwater East, Columbus metallurgical and East Boulder employees and affiliated United Steelworkers Union (USW) members for their constructive engagement throughout the negotiations. Despite the impact on the performance for Q3 2026, the conclusion of the multi-year collective bargaining agreements supports the long-term sustainability and competitiveness of the US PGM operations, in the interests of all stakeholders. In South Africa at our Rustenburg operations, the Kwezi Section 189 consultation process, associated with the potential closure of the Kwezi shaft, commenced on 8 September 2026, and I wish to acknowledge the constructive engagement and professionalism demonstrated by all parties throughout the process to date. We are assessing available options to mine the Kwezi Shallows project as the consultation process continues. The Sandouville consultation process with employee representatives, relating to the future of the Sandouville refinery was initiated in September 2026 and is ongoing.

The macroeconomic outlook remains volatile, with weaker global growth expectations, persistent inflation and higher interest rates continuing to weigh on economic activity and consumer spending, including vehicle demand. Precious metals markets remained mixed during Q3 2026, with gold spot prices strengthening towards quarter-end on continued geopolitical uncertainty and investment demand, while platinum and rhodium spot prices rallied despite softer automotive demand expectations. PGM market development remains important, and we continue to progress strategic market development initiatives with our partners. Kleantha Pillay, EVP: Sales and Marketing, who has played a pivotal role in the development of the Group's sales and marketing function, will leave the Group on 31 January 2027. Kleantha will be succeeded by Henk de Hoop, who has been appointed as Global Head of Sales and Marketing with effect from 1 November 2026. Further, Emma Chapman declined the appointment as Head of Investor Relations. The search for a suitably qualified candidate is ongoing.

Significant volatility in precious metals prices has been seen during October 2026. Lithium prices remained under pressure as global lithium supply forecasts were upgraded, outpacing demand growth and resulting in a larger than expected market surplus for 2026. Despite navigating geopolitical complexity and macroeconomic volatility we remain resolute in our  purpose to create a better future for people and planet and we achieve this through a simple philosophy – produce the metals the world needs, invest in our people, strengthen the communities in which we operate and create and deliver sustainable value for all stakeholders.

As we enter the final quarter of 2026 and finalise our life-of-mine plans for 2027, we remain focused on creating long-term stakeholder value through portfolio and operational simplification, safe and sustainable production, operational excellence, disciplined capital allocation, and the delivery of our value-accretive life extension projects.

SAFE PRODUCTION

The safety and health of our workforce remains our highest priority. Safe production is the cornerstone of performance excellence and is fundamental to delivering the Group’s strategic objectives.

The Group recorded a 10% improvement in the SIFR, with the rate declining from 2.29 for the nine months ended 30 September 2025 to 2.05 for the nine months ended 30 September 2026. The total recordable injury frequency rate (TRIFR) improved by 9%, decreasing from 3.96 to 3.61. The fatal injury frequency rate (FIFR) improved from 0.041 in 2025 to 0.025. High-potential incidents declined by 30% compared to the nine months ended 30 September 2025.

Despite these positive trends, Q3 2026 was marked by the tragic loss of Mr Lwandile Kohliso, a team member at Beatrix, who was found deceased underground on 21 September 2026. The cause of death has not yet been determined and a thorough investigation by management and the relevant authorities is continuing. On 23 July 2026, Mr Chinonge Kalie, a contractor within the protection services team, was fatally injured in a shooting involving illegal miners at Beatrix. The Board and management of Sibanye-Stillwater extend their sincere condolences to the families and friends of our late colleagues during this difficult time. 

To support our goal of zero fatalities, the Group is intensifying implementation of its Fatal Elimination Strategy, with a focus on leadership accountability, critical risk management and operational discipline. The safety culture uplift programme, launched in 2025 and in support of the Fatal Elimination Strategy, has evolved into an integrated safety and performance acceleration programme. The programme is being  rolled out across the South African operations, supported by additional leadership engagement and executive sponsorship, with the objective of delivering sustainable improvements in safety and overall operational performance.

OPERATIONAL REVIEW

Southern Africa (SA) operations

SA PGM operations

Reflecting the seasonally stronger third quarter, the SA PGM operations delivered their best quarterly production performance of 2026 and are expected to deliver in line with full-year guidance. Year-on-year production performance (including third party purchase of concentrate (PoC)) decreased by 10% to 458,202 4Eoz, mainly due to planned lower surface production and expected lower production from Rustenburg (specifically the Kroondal operations).

Adjusted EBITDA increased by 16% year-on-year to R5.8 billion (US$354 million) in Q3 2026, driven by stable 4E PGM sales volumes and a 15% increase in the average 4E PGM basket price to R37,250/4Eoz (US$2,288/4Eoz).

Production from underground mining (excluding Mimosa) decreased by 10% (41,484 4Eoz) year-on-year, primarily due to lower production from the Kroondal mechanised operation, in line with its life-of-mine profile as ore reserves are progressively depleted, particularly at the Kwezi operation, and the closure of the Klipfontein opencast operations. Production from the Marikana operation was supported by the build-up at the K4 shaft, which contributed 30,453 4Eoz in Q3 2026, an increase of 8% quarter-on-quarter.

Surface production (excluding PoC) declined by 36% year-on-year due to the depletion of surface reserves primarily due to the transition to a new feed source at Marikana, the depletion of surface reserves at Rustenburg and lower feed availability at Platinum Mile as previously reported. 

Third party PoC increased by 7% (1,211 4Eoz) year-on-year to 18,400 4Eoz, mainly due to higher tonnages received from third parties.

All-in sustaining cost (AISC) excluding PoC, for the managed operations increased by 5% in absolute terms. Costs increased due to higher sustaining and ore reserve development capital expenditure, inflationary pressure on input costs, higher consumables expenditure driven by increased fuel, lubricant and steel costs, and higher royalty taxes associated with the stronger PGM basket price. Year-on-year, unit AISC was also negatively impacted by 11% lower production.

Total capital expenditure for Q3 2026 increased by 33% year-on-year to R1.9 billion (US$119 million). Ore reserve development capital expenditure increased by 4% to R672 million (US$41 million), while sustaining capital expenditure increased by 46% to R961 million (US$59 million), driven mainly by the Thembelani extension project and the refurbishment work at the precious metals refinery (PMR). Project capital expenditure increased by 97% to R303 million (US$19 million) as the Marikana K4 project advanced towards steady-state production and development commenced at the Siphumelele UG2 project.

Total chrome production from the SA PGM operations was 545kt for Q3 2026, 19% lower year-on-year due to the cessation of the Marikana bulk tailings treatment (BTT) chrome plant in Q4 2025. Chrome sales volumes increased by 14% to 585kt, mainly due to the release of stock.

Please refer to page 6,11,12 and 15 for further operational results statistics.

SA gold operations

Supported by a strong gold price environment, the SA gold operations continued to advance their transition to a shallower, higher-margin, longer-life portfolio. Year-on-year, the 17% increase in surface production to 1,712kg (55,042oz) and a 14% higher gold price received of R2,208,545/kg (US$4,219/oz) partially offset the impact of a 22% decline in underground production, resulting in an 8% lower adjusted EBITDA of R3.4 billion (US$210 million) for Q3 2026.

Underground production declined year-on-year by 17% at Beatrix, 21% at Driefontein and 31% at Kloof. Reduced operational flexibility at Beatrix as mining advanced to deeper levels of the mine, coupled with challenging ground conditions in high-grade areas, impacted productivity and average mining grade. Production at Driefontein was adversely affected by flooding at the Khomanani 8 Shaft in August, which resulted in a six-week suspension of mining activities and constrained operational flexibility. Lower production at Kloof was consistent with its planned rebased life-of-mine profile.

AISC (excluding DRDGOLD) increased by 7% in absolute terms mainly due to inflationary increases in input costs, higher royalties, additional pumping costs incurred at Driefontein and additional working crews at Beatrix. Unit AISC (excluding DRDGOLD) increased by 23% year-on-year to R1,868,560/kg (US$3,570/oz) in Q3 2026, primarily due to lower gold sales driven by the 18% decline in production. The SA gold operations unit AISC including DRDGOLD is 11% lower at R1,668,973/kg (US$3,189/oz) (when compared to unit AISC excluding DRDGOLD) reflecting the growing surface contribution as the SA gold portfolio transitions towards a shallower, lower risk and lower cost production profile.

Capital expenditure for Q3 2026 (excluding DRDGOLD) decreased by 23% year-on-year to R792 million (US$49 million), largely reflecting the cessation of capitalisation at Kloof. This was partially offset by increased capital expenditure at Driefontein and Beatrix to develop mining areas and enable safe, sustainable production and processing operations.

The Burnstone Restart Project has transitioned positively into the execution phase, with project governance structures being established and key personnel appointments underway to support successful delivery.

DRDGOLD production increased by 10% year-on-year to 1,307kg (42,021oz) in Q3 2026, driven by a 15% improvement in yield to 0.21g/t, despite a 5% decrease in tonnes treated. Operating unit costs increased by 3% to R1,040,551/kg (US$1,988/oz) as higher labour, diesel, reagent costs and electricity tariffs were partially offset by increased production.

Project capital expenditure at DRDGOLD declined by 29% year-on-year to R556 million (US$34 million) from R782 million (US$44 million), as several of DRDGOLD's Vision 2028 projects advanced towards completion and moved beyond their peak capital investment phase.

Please refer to page 9, 13 and 16 for further operational results statistics.

International and recycling operations

US PGM operations

Operating metrics in Q3 2026 were significantly impacted by the USW strike, which commenced on 3 September 2026 affecting the Stillwater mine and the metallurgical complex. The strike ended following the ratification of a new collective bargaining agreement, with employees returning to work on 9 October 2026.

The new agreement covers a broad range of terms, including wage increases of 4.5% in the first year, the greater of 3.5% or US consumer price index (CPI) in the second year, and the greater of 3.0% or CPI in third year. Key however, is the introduction of team-based incentives and work practices aligned with the transition to fully mechanised mining. This represents an important milestone in the transformation of the US PGM operations that will contribute to ensuring the operations sustainability and competitiveness. 

The US PGM operations have a clear, sustainable and executable productivity-led plan, targeting a structurally lower AISC of ~US$1,000/2Eoz by the end of 2028. This is underpinned by productivity improvements that support an estimated 45% increase in steady-state production to approximately 410k 2Eoz from East Boulder and Stillwater East as the mechanisation programme is completed by H2 2028. 

Production decreased by 19% to 59,417 2Eoz. Production sold declined by 7% to 72,514 2Eoz, as built-up concentrate inventories were processed during the strike. As a result, the strike's full impact on sales volumes will only become evident in Q4 2026, when inventory levels are expected to normalise.

Adjusted EBITDA increased by 9% year-on-year to US$36 million (R580 million), primarily driven by a 19% increase in the 2E PGM basket price to US$1,411/2E oz (R22,971/2Eoz), compared with US$1,184/2E (R20,886/2Eoz) oz in Q3 2025.

AISC increased by 39% year-on-year to US$1,617/2Eoz (R26,322/2Eoz), reflecting lower production and higher capital expenditure. Excluding Section 45X credits, AISC increased to US$1,809/2Eoz (R29,445/2Eoz) from US$1,306/2Eoz (R23,034/2Eoz) in Q3 2025.

Total capital expenditure increased to US$38 million (R617 million) (Q3 2025: US$22 million, R396 million). Sustaining capital expenditure rose to US$16 million (R268 million) from US$3 million (R57 million) in Q3 2025, in line with the mechanisation strategy and primarily driven by investments in mobile and underground equipment, including bolters, transport equipment, surface fleet and supporting infrastructure.

Labour attrition increased significantly across all operations during the wage negotiation period, leaving staffing levels approximately 25% below the planned 2027 mechanised workforce. Q4 2026 will focus on rebuilding work teams, restoring operational momentum and supporting the ramp-up to planned production levels.

The impact of the strike, together with the time required to rebuild operational performance in Q4 2026, has resulted in revised production guidance of 245k - 255k 2Eoz and cost guidance of AISC of US$1,700 - US$1,760/2Eoz, including Section 45X: US$1,510 - US$1,570/2Eoz (previous 2026 annual guidance of 280k - 300k 2Eoz and AISC of US$1,520 - US$1,580/2Eoz, including Section 45X: US$1,360 - US$1,420/2Eoz).

Please refer to page 6, 11 and 15 for further operational results statistics.

Recycling operations

Adjusted EBITDA from the Recycling operations increased by 54% year-on-year to US$40 million (R652 million), driven by higher precious metal prices, the successful integration of North Carolina (NC) and higher production at Pennsylvania (PA). The Recycling operations adjusted EBITDA excluding Section 45X credits from the Montana site increased by 41% year-on-year to US$25 million (R406 million).

1.2 million ounces of precious metals were sold during the quarter, comprising 89% silver, 8% 3E PGMs and 3% gold. Continued feed optimisation and integration across the PA, NC and Montana facilities enhanced asset utilisation and supported improved commercial performance.

Keliber lithium project

Hot commissioning of the Keliber concentrator began in April 2026 and continued throughout Q3 2026, with efforts focused on achieving target lithium grades within product specifications. Q4 2026 will focus on completing the hot commissioning and testing the concentrator at design capacity, with encouraging progress having been made since the end of Q3 2026.

Keliber project capital expenditure for Q3 2026 was €16 million, or R0.3 billion, (year to date €75 million or R1.4 billion) including capitalised interest and expenditure outside the project’s initial forecast scope. Cumulative construction-phase capital expenditure at 30 September 2026 was €726 million (R13.8 billion), excluding capitalised interest and exploration. The project remains within the approved capital forecast of €783 million (R14.9 billion) in 2024 real terms.

In response to lithium market volatility, the staged commissioning approach prioritises stable mining and concentrator performance before the refinery start-up, reducing integrated ramp-up risk and preserving capital flexibility.

* The figures have been translated where relevant at an average exchange rate of R19.01/€

Sandouville nickel refinery

Sandouville remains on care and maintenance, with site activities focused on asset integrity and regulatory compliance.

During September 2026, a consultation process regarding the future of the Sandouville refinery was initiated with employee representatives in accordance with applicable French labour law requirements. The Company continues to work with the French government to find the best possible solution that is in the interest of all stakeholders. No final decisions have been taken and the ongoing consultation process will inform the assessment of available options.

Century zinc retreatment operation

Payable zinc production increased by 2% year-on-year to 25kt in Q3 2026, from 24kt in Q3 2025. The increase primarily reflects the lower comparative production base following the planned shutdown in Q3 2025. The next planned shutdown is scheduled for Q4 2026.

AISC increased by 25% year-on-year to US$2,520/tZn (15% to R41,022/tZn), primarily driven by inflationary cost pressures, including higher fuel and reagent cost (primarily copper sulphate).

Payable zinc sales increased by 72% to 29kt, compared with 17kt in Q3 2025, largely due to shipment timing.

Adjusted EBITDA more than doubled to US$57 million (R925 million) from US$28 million (R486 million) in Q3 2025. The improvement was driven by higher payable zinc sales volumes, a 51% increase in equivalent zinc concentrate prices and lower treatment charges.

Sustaining capital expenditure increased to US$2 million (R28 million), compared with US$1 million (R11 million) in Q3 2025. The increase primarily reflects rehabilitation equipment rebuilds and additional hydro-mining cannon equipment to support the optimisation of dam-floor mining. Capital expenditure remains focused on maintaining the reliability of critical infrastructure as the operation approaches the end of its mine life.

Options to realise value from the existing Century and Karumba infrastructure and to evaluate potential life-extension opportunities beyond the current zinc retreatment operations continue to be assessed.

Please refer to page 10 and 14 for further operational results statistics.

Mt Lyell copper project

Following the Board's approval of the restart investment in Q3 2026, pre-execution planning and preparatory activities have commenced. Front-end engineering and design, project team recruitment, initial accommodation works and the progression of key regulatory and operational approvals are underway. 

OPERATING GUIDANCE FOR 2026*

Annual operating guidance is updated for the US PGM operations to reflect the impact of the strike and operational normalisation in Q4 2026. The annual 2026 operating guidance for all remaining operations is unchanged as in the table below. 

2026 Annual guidanceProductionAll-in sustaining costTotal capital

SA 

operations

SA PGM operations 

(4E PGMs)

1.65 - 1.75Moz3,4

R26,500 - 27,500/4Eoz 

(US$1,453 - 1,508/4Eoz)²

R8bn (US$439m)² 

(incl. R1.79bn (US$98m) for project capital)

SA gold operations 

(excl. DRDGOLD)

13,700 - 14,700kg

(440 - 473koz)

R1,750k - 1,840k/kg 

(US$2,984 - 3,138/oz)²

R3bn (US$164m)² (incl. R98m (US$5m) for Burnstone project capital)

SA gold operations

(incl. DRDGOLD)7

19,100 - 19,750kg

(614 - 635koz)

R1,565k - R1,685k/kg

(US$2,670 - 2,870/oz)2

R6.6bn (US$364m)2

(incl. R3.1bn (US$172m) for DRDGOLD project capital)

International 

operations

US PGM operations

(2E mined)

245 - 255kozUS$1,700 – 1,760/2Eoz Including Section 45X: US$1,510 – 1,570/2Eoz

US$125m - US$135m (incl. US$6m growth)

(R2.3bn - R2.5bn incl. R109m growth)²

Recycling operations      (Columbus, PA and NC)

(PGM autocats, industrial and e-waste precious metals 

bearing waste) 

Total 400 - 420koz

gold equivalent ounces5

n/aUS$12.2m (R223m)²
Keliber lithium project

15k - 20k 

tonnes of spodumene concentrate

n/a

€180m - €190m6 (R3.7bn – R3.9bn)²

(incl. €90m (R1.8bn) for project capital)

Century zinc operations

86.3k - 98.3k 

tonnes (payable)

A$3,400 – 3,800/t (R42,160 – 47,120/t)² (US$2,311 - 2,583/t)²

A$5m - A$5.5m 

(US$3.4m – US$3.7m, R62m - R68.2m)²

Mt Lyelln/an/a

A$11m 

(US$7.5m, R136m)2,8

Source: Company forecasts, Note: Guidance does not take into account the impact of unplanned events

  • As at 5 November 2026
  1. US PGM AISC is impacted by tax and royalties paid based on PGM prices, current guidance was based on spot 2E PGM prices of US$1,500/oz; By product credit assumptions of Rh US$9,000/oz and gold US$4,400/oz
  2. Estimates are converted at an exchange rate of R18.24/US$, R20.43/€ and R12.40/A$
  3. SA PGM operations production guidance includes third party PoC and 50% attributable production from Mimosa
  4. SA PGM operations AISC excludes the purchase cost of third party PoC and Mimosa costs and capital (equity accounted)
  5. Gold equivalent ounce production calculated using the following metal pricing: Au US$2,506/oz, Ag US$38/oz, Pt US$1,150/oz, Pd US$1,050, Ir US$4,000/oz, Rh US$4,800/oz, Ru US$500/oz and Cu US$4.4/lb
  6. 2026 guided capital includes construction phase start-up capital, sustaining cost and capitalised cost. The current production profile includes the Syväjärvi and Rapasaari open pit mining areas
  7. DRDGOLD included at 100%
  8. An accrual of A$14.7 million (US$10 million, R182 million) was recognised during Q3 2026 as deferred acquisition consideration arising from the positive investment decision relating to Mt Lyell as announced in September 2026. This is only payable on first production, expected early 2029

RICHARD STEWART 

CHIEF EXECUTIVE OFFICER

 

SALIENT FEATURES AND COST BENCHMARKS – QUARTERS

 

US and SA PGM operations

     
   US PGM operationsTotal SA PGM operations2RustenburgMarikana2Plat MileMimosa
   

Under-

ground1

Total

Under-

ground

Surface

Under-

ground

Surface

Under-

ground

SurfaceSurfaceAttribu-table
Production
Tonnes milled/treatedktSep 2026                177              8,205               4,773               3,432               2,757               1,107               1,667                   645              1,680                   349  
  Jun 2026                199               7,524               4,368               3,156               2,535                  876               1,475                  802               1,478                  357  
  Sep 2025                198            10,343                5,283               5,061               3,152               1,407               1,760                  960               2,694                  370  
Plant head gradeg/tSep 2026            11.44                  2.25                 3.22                 0.91                 2.95                 1.24                 3.69                 0.91                 0.69                 3.13  
  Jun 2026             11.62                 2.29                 3.29                 0.91                 3.03                 1.24                 3.75                 0.92                 0.70                 3.22  
  Sep 2025             12.73                 2.12                 3.23                 0.96                 2.97                 1.15                 3.67                 1.36                 0.72                 3.39  
Plant recoveries%Sep 2026            91.64               74.10               85.26               18.42               84.85               24.89               86.86                  8.06              16.09               78.69   
  Jun 2026             90.89               73.37               84.37               17.98               84.10               27.10               86.98                 8.14               15.64               74.03  
  Sep 2025             90.61               70.05               84.73               18.60               84.77               22.55               86.68               20.52               13.98               73.42  
Yieldg/tSep 2026            10.48                  1.67                 2.75                 0.17                 2.50                 0.31                 3.21                 0.07                 0.11                 2.46  
  Jun 2026             10.56                 1.68                 2.78                 0.16                 2.55                 0.34                 3.26                 0.07                 0.11                 2.38  
  Sep 2025             11.53                 1.49                 2.74                 0.18                 2.52                 0.26                 3.18                 0.28                 0.10                 2.49  
PGM production34Eoz - 2EozSep 2026          59,417           439,802           421,303             18,499           221,878             10,980           171,795               1,522               5,997             27,630   
  Jun 2026          69,544           406,406           389,811             16,595           207,693                9,460          154,721                1,932               5,203            27,397   
  Sep 2025          73,171           493,863           464,803             29,060           255,126             11,731           180,031                8,612               8,717            29,646   
PGM sold44Eoz - 2EozSep 2026          72,514           449,658             202,319             11,333   199,663            5,997             30,346   
  Jun 2026          63,159           426,134             175,044             12,522   203,294             5,203            30,071   
  Sep 2025          78,340           457,197             195,282             13,760   200,872             8,717            38,566   
Price and costs5
Average PGM basket price6R/4Eoz - R/2EozSep 2026          22,971             37,250               37,588             32,982   37,187          35,019             32,994   
  Jun 2026          25,116             40,967               41,280             36,987   40,919          38,318             36,473   
  Sep 2025          20,886             32,438               32,732             29,629   32,387          29,929             29,172   
 US$/4Eoz - US$/2EozSep 2026            1,411               2,288                 2,309               2,026   2,284            2,151               2,027   
  Jun 2026             1,524               2,486                 2,505               2,244  2,483             2,325               2,213  
  Sep 2025             1,184               1,839                 1,856               1,680  1,836             1,697               1,654  
Operating cost7,9R/tSep 2026            6,570               1,505                 2,246   3772,170                119              1,889   
  Jun 2026             6,255               1,544                 2,360                  340  2,028                111               1,785  
  Sep 2025             6,706               1,122                 1,942                  197  1,684                  77               1,881  
 US$/tSep 2026                404                    92                    138                    23  133                    7                  116  
  Jun 2026                380                    94                    143                    21  123                    7                  108  
  Sep 2025                380                    64                    110                    11  95                    4                  107  
 R/4Eoz - R/2EozSep 2026          19,540             28,694               27,907             37,978   28,953          33,350             23,851   
  Jun 2026          17,859             29,195               28,812             31,501   29,486          31,520             23,287   
  Sep 2025          18,122             24,094               23,988             23,613   24,279          23,861             23,511   
 US$/4Eoz - US$/2EozSep 2026            1,200               1,763                 1,714               2,333   1,778            2,049               1,465   
  Jun 2026             1,084               1,772                 1,748               1,911  1,789             1,913               1,413  
  Sep 2025             1,027               1,366                 1,360               1,339  1,376             1,353               1,333  
All-in sustaining cost7,8,9R/4Eoz - R/2EozSep 2026          26,322             26,598     26,02427,372          26,513             23,634   
  Jun 2026          23,093             27,767     28,04527,456          25,562             25,331   
  Sep 2025          20,555             22,537     23,24121,697          19,961             23,410   
 US$/4Eoz - US$/2EozSep 2026            1,617               1,634     1,5991,681            1,629               1,452   
  Jun 2026             1,401               1,685    1,7021,666             1,551  1,537
  Sep 2025             1,165               1,278    1,3181,230             1,132  1,327
All-in cost7,8,9R/4Eoz - R/2EozSep 2026          27,366             27,333     26,38128,520          26,513             23,634   
  Jun 2026          24,100             28,276     28,40428,190          25,562             25,331   
  Sep 2025          21,716             22,869     23,29722,434          19,961             23,410   
 US$/4Eoz - US$/2EozSep 2026            1,681               1,679     1,6201,752            1,629               1,452   
  Jun 2026             1,462               1,716    1,7241,711             1,551               1,537  
  Sep 2025             1,231               1,296    1,3211,272             1,132               1,327  
Capital expenditure5
Ore reserve developmentRmSep 2026                293                  672    217455                   —                    — 
  Jun 2026                362                  622    210412                   —                    — 
  Sep 2025                263                  644    203441                   —                    — 
Sustaining capitalRmSep 2026                268                  961    472489                   —                 123  
  Jun 2026                143                  693    395297                    1                  132  
  Sep 2025                  57                  656    367278                  11                    75  
Project capital RmSep 2026                  56                  303    83199                   —                    — 
  Jun 2026                  59                  193    78115                   —                    — 
  Sep 2025                  76                  154    15139                   —                    — 
Total capital expenditureRmSep 2026                617              1,936     7721,143                   —                 123  
  Jun 2026                564               1,508    683824                    1                  132  
  Sep 2025                396               1,454    585858                  11                    75  
 US$mSep 2026                  38                  119    4770                   —                     8  
  Jun 2026                  34                    92    4150                   —                     8  
  Sep 2025                  22                    82    3349                    1                      4  

Average exchange rate for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. The US PGM operations’ underground production is converted to metric tonnes and kilograms, and financial performance is translated into Rand
  2. Total SA PGM operation and Marikana excludes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Quarters” and “Reconciliation of AISC and AIC excluding third party PoC for Total SA PGM operations and Marikana – Quarters”
  3. The Platinum Group Metals (PGM) production in the SA operations is principally platinum, palladium, rhodium and gold, referred to as 4E (3PGM+Au) and measured at the concentrator, and in the US underground operations is principally platinum and palladium, referred to as 2E (2PGM)
  4. PGM sold includes the third party PoC ounces sold
  5. Total SA PGM operations’ unit cost benchmarks and capital expenditure exclude the financial results of Mimosa, which is equity accounted and excluded from revenue and cost of sales
  6. The average PGM basket price is the PGM revenue per 4E/2E ounce, prior to a purchase of concentrate adjustment
  7. Operating cost, All-in sustaining costs and All-in costs are not measures of performance under IFRS Accounting Standards and should not be considered in isolation or as substitutes for measures of financial performance prepared in accordance with IFRS Accounting Standards. See "Non-IFRS measures" for more information on the metrics presented by Sibanye-Stillwater. All-in sustaining costs and All-in costs are considered pro-forma performance measures under the JSE Listing Requirements. This pro-forma financial information is the responsibility of the Group's Board of Directors and is presented for illustration purposes only, and because of its nature, All-in sustaining costs and All-in costs should not be considered as a representation of financial performance
  8. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. For a reconciliation of cost of sales, before amortisation and depreciation to All-in cost, see “All-in costs - Quarters”
  9. The Section 45X Advance Manufacturing Production Credits relating to US PGM underground operations for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 were R186 million (US$11 million), R228 million(US$14 million) and R181 million (US$10 million) respectively  

 

 

SALIENT FEATURES AND COST BENCHMARKS – QUARTERS (continued)

 

SA gold operations

              
SA OPERATIONS
   Total SA goldDriefonteinKloofBeatrixCookeDRDGOLD
   Total

Under-

ground

Surface

Under-

ground

Surface

Under-

ground

Surface

Under-

ground

SurfaceSurfaceSurface
Production
Tonnes milled/treatedktSep 2026            8,354                  729              7,625                  248                    62                 180                 204                 302                    —             1,188               6,170   
  Jun 2026            8,381                 721              7,660                 271                    62                 150                 172                 300                    —             1,080              6,345  
  Sep 2025            8,408                 864              7,544                 296                    —                237                    74                 332                    —                989              6,481  
Yieldg/tSep 2026              0.58                4.28                0.22                7.24                1.14                3.37                0.45                2.39                    —               0.20                0.21  
  Jun 2026              0.57                4.25                0.23                6.50                0.26                3.87                0.64                2.42                    —               0.30                0.20  
  Sep 2025              0.65                4.64                0.19                7.66                    —               3.68                0.73                2.63                    —               0.22                0.18  
Gold producedkgSep 2026            4,835               3,123               1,712               1,794                     71                 606                    92                 723                    —                242              1,307   
  Jun 2026            4,798              3,066              1,732              1,760                    16                 581                 110                 725                    —                323              1,283  
  Sep 2025            5,472              4,010              1,462              2,263                    —                874                    54                 873                    —                217              1,191  
 ozSep 2026       155,449          100,407             55,042             57,678               2,283             19,483               2,958             23,245                     —             7,780             42,021   
  Jun 2026        154,259             98,574             55,685             56,585                  514            18,680               3,537            23,309                     —           10,385             41,249   
  Sep 2025        175,929           128,924             47,004             72,757                     —           28,100               1,736            28,068                     —             6,977            38,292   
Gold soldkgSep 2026            4,915               3,215               1,700               1,883                     42                 606                    72                 726                    —                262              1,324   
  Jun 2026            4,936              3,171              1,765              1,725                    10                 627                 145                 819                    —                288              1,322  
  Sep 2025            5,361              3,911              1,450              2,258                    —                831                    30                 822                    —                262              1,158  
 ozSep 2026       158,021          103,365             54,656             60,540               1,350             19,483               2,315             23,341                     —             8,423             42,568   
  Jun 2026        158,696           101,950             56,746             55,460                  322            20,159               4,662            26,331                     —             9,259            42,503   
  Sep 2025        172,360           125,742             46,619             72,596                     —           26,717                  965            26,428                     —             8,423            37,231   
Price and costs
Gold price receivedR/kgSep 2026    2,208,545     2,214,0262,150,4422,210,7442,209,924    2,228,852   
  Jun 2026    2,352,512     2,355,0432,283,6792,366,3002,368,056    2,377,458   
  Sep 2025    1,929,491     1,857,3961,744,4831,843,0661,908,397    1,947,323   
 US$/ozSep 2026            4,219     4,2304,1084,2244,222            4,258   
  Jun 2026            4,440    4,4454,3104,4664,469            4,487  
  Sep 2025            3,402    3,2753,0763,2503,365            3,434  
Operating cost1,4R/tSep 2026               835              6,861                  259              8,562                  577              9,068                  593              4,150                     —                384                 220  
  Jun 2026               803              6,522                 265              7,353                 673              9,914              1,040              4,072                    —                488                 201  
  Sep 2025               757              5,435                 221              7,055                    —             6,435                 282              3,276                    —                450                 186  
 US$/tSep 2026                  51                 421                    16                 526                    35                 557                    36                 255                    —                   24                    14  
  Jun 2026                  49                 396                    16                 446                    41                 602                    63                 247                    —                   30                    12  
  Sep 2025                  43                 308                    13                 400                    —                365                    16                 186                    —                   26                    11  
 R/kgSep 2026    1,443,226       1,602,626       1,152,453       1,182,274          507,042       2,691,419       1,315,217       1,733,057                     —     1,884,298   1,040,551
  Jun 2026    1,402,251       1,533,594       1,169,746       1,131,250       2,625,000       2,564,544       1,627,273       1,684,138                     —     1,631,579           996,103   
  Sep 2025    1,163,743       1,171,571       1,142,271           921,343                     —     1,747,140           388,889       1,243,986                     —     2,050,691       1,010,915   
 US$/ozSep 2026            2,757               3,062               2,202               2,259                  969              5,142               2,513               3,311                     —             3,600               1,988   
  Jun 2026            2,647              2,894              2,208              2,135              4,954              4,840              3,071              3,179                    —             3,079              1,880  
  Sep 2025            2,052              2,066              2,014              1,625                    —             3,081                 686              2,193                    —             3,616              1,782  
All-in sustaining cost1,2R/kgSep 2026    1,668,973     1,594,2862,547,1981,964,1871,854,962    1,156,344   
  Jun 2026    1,640,802     1,636,8882,349,7411,804,6401,940,972    1,071,104   
  Sep 2025    1,385,189     1,267,9362,119,6281,397,8101,988,550    1,045,769   
 US$/ozSep 2026            3,189     3,0464,8673,7533,544            2,209   
  Jun 2026            3,097    3,0894,4353,4063,663            2,022  
  Sep 2025            2,442    2,2363,7372,4653,506            1,844  
All-in cost1,2R/kgSep 2026    1,784,741     1,594,2862,547,1981,964,1871,854,962    1,576,284   
  Jun 2026    1,875,000     1,636,8882,349,7411,804,6401,940,972    1,922,088   
  Sep 2025    1,533,483     1,267,9362,119,6281,397,8101,988,550    1,721,071   
 US$/ozSep 2026            3,410     3,0464,8673,7533,544            3,012   
  Jun 2026            3,539    3,0894,4353,4063,663            3,628  
  Sep 2025            2,704    2,2363,7372,4653,506            3,035  
Capital expenditure
Ore reserve developmentRmSep 2026               600    524—76                  —                   — 
  Jun 2026               581    517—64                  —                   — 
  Sep 2025               821    47328167                  —                   — 
Sustaining capitalRmSep 2026               306    145—41                  —                120  
  Jun 2026               253    127—28                  —                   98  
  Sep 2025               253    1126426                  —                   51  
Project capital3RmSep 2026               562    ———                  —                556  
  Jun 2026            1,135    ———                  —             1,125  
  Sep 2025               786    ———                  —                782  
Total capital expenditure4RmSep 2026            1,468     669—117                  —                676  
  Jun 2026            1,969    644—92                  —             1,223  
  Sep 2025            1,860    58534593                  —                833  
 US$mSep 2026                  90    41—7                  —                   42  
  Jun 2026               119    39—6                  —                   74  
  Sep 2025               105    33205                  —                   47  

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. Operating cost, All-in sustaining costs and All-in costs are not measures of performance under IFRS Accounting Standards and should not be considered in isolation or as substitutes for measures of financial performance prepared in accordance with IFRS Accounting Standards. See "Non-IFRS measures" for more information on the metrics presented by Sibanye-Stillwater. All-in sustaining costs and All-in costs are considered pro forma performance measures under the JSE Listing Requirements. This pro-forma financial information is the responsibility of the Group's Board of Directors and is presented for illustration purposes only, and because of its nature All-in sustaining costs and All-in costs should not be considered as a representation of financial performance
  2. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. For a reconciliation of cost of sales before amortisation and depreciation to All-in cost, see “All-in costs – Quarters”
  3. The total project capital expenditure for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 includes R6 million (US$— million), R10 million (US$1 million) and R4 million (US$— million), respectively, which relates mainly to various security capital requirements and the Burnstone project not included under specific operations above
  4. Due to the Kloof operations having a life of mine of 1 year as of 31 December 2025, all capital expenditure is expensed

SALIENT FEATURES AND COST BENCHMARKS – QUARTERS (continued)

 

Australian operations

Century zinc retreatment operation
Production   
Ore mined and processedktSep 2026                    2,160   
  Jun 2026                    2,196  
  Sep 2025                    2,063  
Zinc ore grade processed%Sep 2026                      2.83  
  Jun 2026                      2.75  
  Sep 2025                      2.87  
Plant recoveries%Sep 2026                    49.73   
  Jun 2026                    49.37  
  Sep 2025                    49.97  
Concentrate produced1ktSep 2026                          68  
  Jun 2026                          66  
  Sep 2025                          64  
Concentrate zinc grade2%Sep 2026                    44.79   
  Jun 2026                    45.00  
  Sep 2025                    46.11  
Zinc in concentrate produced3ktSep 2026                          30  
  Jun 2026                          30  
  Sep 2025                          30  
Payable zinc production4ktSep 2026                          25  
  Jun 2026                          25  
  Sep 2025                          24  
Payable zinc sales5ktSep 2026                          29  
  Jun 2026                          18  
  Sep 2025                          17  
Price and costs   
Average equivalent zinc concentrate price6R/tZnSep 2026                  66,085   
  Jun 2026                  68,842   
  Sep 2025                  47,562   
 US$/tZnSep 2026                    4,059   
  Jun 2026                    4,177  
  Sep 2025                    2,696  
All-in sustaining cost7,8R/tZnSep 2026                  41,022   
  Jun 2026                  35,323   
  Sep 2025                  35,539   
 US$/tZnSep 2026                    2,520   
  Jun 2026                    2,143  
  Sep 2025                    2,015  
All-in cost7,8R/tZnSep 2026                  41,022   
  Jun 2026                  35,730   
  Sep 2025                  36,560   
 US$/tZnSep 2026                    2,520   
  Jun 2026                    2,168  
  Sep 2025                    2,073  
Capital expenditure   
Sustaining capitalRmSep 2026                          28  
  Jun 2026                            4  
  Sep 2025                          11  
Project capitalRmSep 2026                          — 
  Jun 2026                          10  
  Sep 2025                          25  
Total capital expenditureRmSep 2026                          28  
  Jun 2026                          14  
  Sep 2025                          36  
 US$mSep 2026                            2  
  Jun 2026                            1  
  Sep 2025                            2  

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. Concentrate produced contains zinc, lead, silver and waste material, which is exported as a relatively dry product
  2. Concentrate zinc grade is the percentage of zinc contained in the concentrate produced
  3. Zinc in concentrate produced is the zinc metal contained in the concentrate produced
  4. Payable zinc production is the payable quantity of zinc metal produced after applying smelter content deductions
  5. Payable zinc sales is the payable quantity of zinc metal sold after applying smelter content deductions
  6. Average equivalent zinc concentrate price is the total zinc sales revenue recognised at the price expected to be received excluding the fair value adjustments divided by the payable zinc sales
  7. All-in sustaining costs and all-in costs are not measures of performance under IFRS Accounting Standards and should not be considered in isolation or as substitutes for measures of financial performance prepared in accordance with IFRS Accounting Standards. See "Non-IFRS measures" for more information on the metrics presented by Sibanye-Stillwater. All-in sustaining costs and All-in costs are considered pro forma performance measures under the JSE Listing Requirements. This pro-forma financial information is the responsibility of the Group's Board of Directors and is presented for illustration purposes only, and because of its nature All-in sustaining costs and All-in costs should not be considered as a representation of financial performance
  8. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. For a reconciliation of cost of sales, before amortisation and depreciation to All-in cost, see “All-in costs - Quarters”

 

ALL-IN COSTS – QUARTERS

 

US and SA PGM operations           

Figures are in rand millions unless otherwise stated

     
   US PGM operations1Total SA PGM operations2RustenburgMarikana2Plat MileMimosaCorporate
Cost of sales, before amortisation and depreciation3 Sep 2026              1,251               12,399                 6,376                 5,790                    233                   745                 (745)
  Jun 2026              1,415              11,668                 5,679                5,803                   186                   693                 (693) 
  Sep 2025              1,259              10,919                 5,435                5,257                   227                   926                 (926) 
Royalties Sep 2026                    —                  367                   207                   160                      —                     42                   (42)
  Jun 2026                    —                  434                   256                   178                      —                     72                   (72) 
  Sep 2025                    —                  267                   229                      38                      —                     51                   (51) 
Carbon tax Sep 2026                    —                     —                     —                     —                     —                     —                     — 
  Jun 2026                    —                       1                      —                       1                      —                     —                     — 
  Sep 2025                    —                       1                      —                       1                      —                     —                     — 
Community costs Sep 2026                    —                     48                        7                      41                      —                     —                     — 
  Jun 2026                    —                     37                        3                      34                      —                     —                     — 
  Sep 2025                    —                     67                      21                      46                      —                     —                     — 
Inventory change Sep 2026                 (90)                 406                   349                      57                      —                  (86)                    86  
  Jun 2026               (173)                  410                   707                 (297)                     —                  (55)                     55  
  Sep 2025                    67                1,220                1,179                      41                      —                (229)                  229  
Share-based payments4 Sep 2026                    19                      71                      40                      31                      —                     —                     — 
  Jun 2026                    25                      91                      48                      42                        1                      —                     — 
  Sep 2025                    18                      47                      27                      26                        1                      —                     — 
Rehabilitation interest and amortisation5 Sep 2026                    14                      68                      43                      25                      —                       3                      (3)
  Jun 2026                    14                      67                      48                      19                      —                       2                      (2) 
  Sep 2025                      8                      47                      37                      10                      —                       2                      (2) 
Leases Sep 2026                    —                     16                        3                      12                        1                      —                     — 
  Jun 2026                    —                     10                        2                        8                      —                     —                     — 
  Sep 2025                    —                     12                        5                        7                      —                     —                     — 
Ore reserve development Sep 2026                 293                   672                   217                   455                      —                     —                     — 
  Jun 2026                 362                   622                   210                   412                      —                     —                     — 
  Sep 2025                 263                   644                   203                   441                      —                     —                     — 
Sustaining capital expenditure Sep 2026                 268                   961                   472                   489                      —                  123                 (123)
  Jun 2026                 143                   693                   395                   297                        1                   132                 (132) 
  Sep 2025                    57                   656                   367                   278                      11                      75                   (75) 
Less: By-product credit Sep 2026               (191)            (3,448)            (1,654)            (1,719)                 (75)               (174)                 174  
  Jun 2026               (180)             (2,854)              (1,258)              (1,541)                   (55)                (150)                  150  
  Sep 2025               (168)             (2,919)              (1,301)              (1,553)                   (65)                (131)                  131  
Total All-in-sustaining costs6,7 Sep 2026              1,564               11,560                 6,060                 5,341                    159                   653                 (653)
  Jun 2026              1,606              11,179                 6,090                4,956                   133                   694                 (694) 
  Sep 2025              1,504              10,961                 6,202                4,592                   174                   694                 (694) 
Plus: Corporate cost, growth and capital expenditure Sep 2026                    62                   303                      83                   199                      —                     —                     21  
  Jun 2026                    70                   193                      78                   115                      —                     —                     — 
  Sep 2025                    85                   154                      15                   139                      —                     —                     — 
Total All-in-costs6,7 Sep 2026              1,626               11,863                 6,143                 5,540                    159                   653                 (632)
  Jun 2026              1,676              11,372                 6,168                5,071                   133                   694                 (694) 
  Sep 2025              1,589              11,115                 6,217                4,731                   174                   694                 (694) 
PGM production4Eoz - 2EozSep 2026            59,417            458,202            232,858            191,717                 5,997               27,630                       — 
  Jun 2026            69,544             428,342             217,153             178,589                 5,203              27,397                       — 
  Sep 2025            73,171             511,052             266,857             205,832                 8,717              29,646                       — 
 kgSep 2026              1,848               14,252                 7,243                 5,963                    187                   859                      — 
  Jun 2026              2,163              13,323                 6,754                5,555                   162                   852                      — 
  Sep 2025              2,276              15,895                 8,300                6,402                   271                   922                      — 
All-in-sustaining cost6,7R/4Eoz - R/2EozSep 2026            26,322               26,848               26,024               27,859               26,513               23,634                       — 
  Jun 2026            23,093               27,882               28,045               27,751               25,562               25,331                       — 
  Sep 2025            20,555               22,769               23,241               22,309               19,961               23,410                       — 
 US$/4Eoz - US$/2EozSep 2026              1,617                 1,649                 1,599                 1,711                 1,629                 1,452                       — 
  Jun 2026              1,401                1,692                1,702                1,684                1,551                1,537                      — 
  Sep 2025              1,165                1,291                1,318                1,265                1,132                1,327                      — 
All-in-cost6,7R/4Eoz - R/2EozSep 2026            27,366               27,552               26,381               28,897               26,513               23,634                       — 
  Jun 2026            24,100               28,363               28,404               28,395               25,562               25,331                       — 
  Sep 2025            21,716               23,089               23,297               22,985               19,961               23,410                       — 
 US$/4Eoz - US$/2EozSep 2026              1,681                 1,692                 1,620                 1,775                 1,629                 1,452                       — 
  Jun 2026              1,462                1,721                1,724                1,723                1,551                1,537                      — 
  Sep 2025              1,231                1,309                1,321                1,303                1,132                1,327                      — 

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. The US PGM operations’ underground production is converted to metric tonnes and kilograms, and financial performance is translated into Rand
  2. Total SA PGM operations and Marikana includes the production and costs associated with the purchase of concentrate (PoC) from third parties. For a reconciliation of the Operating cost, AISC and AIC excluding third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Quarters” and “Reconciliation of AISC and AIC excluding third party PoC for Total SA PGM operations and Marikana – Quarters”
  3. Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
  4. Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
  5. Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current PGM production
  6. All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per ounce and All-in cost per ounce are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total 4E/2E PGM produced (excluding Mimosa) in the same period
  7. The Section 45X Advance Manufacturing Production Credits relating to US PGM underground operations for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 were R186 million (US$11 million), R228 million(US$14 million) and R181 million (US$10 million) respectively  

ALL-IN COSTS – QUARTERS (continued)

 
Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Quarters
  Total SA PGM operationsMarikana
 RmSep 2026Jun 2026Sep 2025Sep 2026Jun 2026Sep 2025
Cost of sales, before amortisation and depreciation as reported per table above             12,399               11,668               10,919                 5,790                5,803                5,257  
Inventory change as reported per table above                  406                   410                1,220                      57                 (297)                     41  
Less: Chrome cost of sales                (177)                (155)                (306)                  (28)                  (29)                  (70) 
Total operating cost including third party PoC             12,628               11,923               11,833                 5,819                 5,477                 5,228   
Less: Purchase cost of PoC                (801)                (858)                (648)                (801)                (858)                (648) 
Total operating cost excluding third party PoC             11,827               11,065               11,185                 5,018                 4,619                 4,580   
        
PGM production as reported per table above4Eoz- 2Eoz          458,202             428,342             511,052             191,717             178,589             205,832   
Less:  Mimosa production            (27,630)            (27,397)            (29,646)                      —                     —                     — 
PGM production excluding Mimosa          430,572            400,945            481,406            191,717            178,589            205,832   
Less: PoC production           (18,400)            (21,936)            (17,189)            (18,400)            (21,936)            (17,189)  
PGM production excluding Mimosa and third party PoC          412,172            379,009            464,217            173,317            156,653            188,643   
        
PGM production including Mimosa and excluding third party PoC          439,802            406,406            493,863            173,317            156,653            188,643   
        
Tonnes milled/treatedkt              8,205                7,524              10,343                 2,312                2,278                2,720  
Less:  Mimosa tonnes                (349)                (357)                (370)                     —                     —                     — 
PGM tonnes excluding Mimosa and third party PoC               7,856                 7,166                 9,973                 2,312                 2,278                 2,720   
Operating cost including third party PoCR/4Eoz-R/2Eoz            29,328               29,737               24,580               30,352               30,668               25,399   
 US$/4Eoz-US$/2Eoz              1,802                 1,804                1,393                1,864                 1,861                1,440  
 R/t              1,607                 1,664                1,187                2,516                 2,405                1,922  
 US$/t                    99                   101                      67                   155                   146                   109  
Operating cost excluding third party PoCR/4Eoz-R/2Eoz            28,694               29,195               24,094               28,953               29,486               24,279   
 US$/4Eoz-US$/2Eoz              1,763                 1,772                1,366                1,778                 1,789                1,376  
 R/t              1,505                 1,544                1,122                2,170                 2,028                1,684  
 US$/t                    92                      94                      64                   133                   123                      95  
Reconciliation of AISC and AIC excluding third party PoC for Total SA PGM operations and Marikana - Quarters
  Total SA PGM operationsMarikana
 RmSep 2026Jun 2026Sep 2025Sep 2026Jun 2026Sep 2025
Total All-in-sustaining cost as reported per table above             11,560               11,179               10,961                  5,341                 4,956                 4,592  
Less: Purchase cost of PoC                 (801)                 (858)                 (648)                 (801)                 (858)                 (648) 
Add: By-product credit of PoC                   204                    203                    149                    204                    203                    149  
Total All-in-sustaining cost excluding third party PoC             10,963               10,524               10,462                 4,744                 4,301                 4,093   
Plus: Corporate cost, growth and capital expenditure                   303                    193                    154                    199                    115                    139  
Total All-in-cost excluding third party PoC             11,266               10,717               10,616                 4,943                 4,416                 4,232   
        
PGM production excluding Mimosa and third party PoC4Eoz- 2Eoz          412,172             379,009             464,217             173,317             156,653             188,643   
        
All-in-sustaining cost excluding third party PoCR/4Eoz-R/2Eoz            26,598               27,767               22,537               27,372               27,456               21,697   
 US$/4Eoz-US$/2Eoz              1,634                  1,685                 1,278                1,681                  1,666                 1,230  
        
All-in-cost excluding third party PoCR/4Eoz-R/2Eoz            27,333               28,276               22,869               28,520               28,190               22,434   
 US$/4Eoz-US$/2Eoz              1,679                  1,716                 1,296                1,752                  1,711                 1,272  

ALL-IN COSTS – QUARTERS (continued)

 

SA gold operations

Figures are in rand millions unless otherwise stated

   SA OPERATIONS
   Total SA goldDriefonteinKloofBeatrixCookeDRDGOLDCorporate
Cost of sales, before amortisation and depreciation1 Sep 2026              7,063                 2,263                 1,711                 1,249                     457                1,383                        — 
  Jun 2026               6,995                 2,049                 1,795                 1,310                    532                 1,309                       — 
  Sep 2025               6,218                 2,130                 1,454                    992                    489                 1,153                       — 
Royalties Sep 2026                  121                    125                        7                      24                        3                       —                   (38)
  Jun 2026                  178                    127                        9                      50                        2                       —                   (10) 
  Sep 2025                    38                    135                        8                      38                        2                       —                 (145) 
Carbon tax Sep 2026                     —                      —                      —                      —                      —                      —                      — 
  Jun 2026                     —                      —                      —                      —                      —                      —                      — 
  Sep 2025                    (4)                      —                      —                     (4)                      —                      —                      — 
Community costs Sep 2026                    22                        1                        2                      12                       —                       7                       — 
  Jun 2026                      3                       —                      —                      —                      —                       3                       — 
  Sep 2025                      7                       —                      —                      —                      —                       7                       — 
Share-based payments2 Sep 2026                    41                      12                        7                        7                        1                      14                       — 
  Jun 2026                    45                      16                        9                        8                       —                     12                       — 
  Sep 2025                    31                        7                        6                        5                        1                      12                       — 
Rehabilitation interest and amortisation3 Sep 2026                    43                      (2)                      1                      13                      25                        4                        2  
  Jun 2026                    39                        5                        2                      14                      25                      (9)                       2  
  Sep 2025                    59                        6                      10                      22                      29                    (10)                       2  
Leases Sep 2026                    13                        4                        1                        5                       —                       3                       — 
  Jun 2026                    11                        2                        1                        5                       —                       3                       — 
  Sep 2025                      8                       —                       2                        3                       —                       3                       — 
Ore reserve development Sep 2026                  600                    524                       —                     76                       —                      —                      — 
  Jun 2026                  581                    517                       —                     64                       —                      —                      — 
  Sep 2025                  821                    473                    281                      67                       —                      —                      — 
Sustaining capital expenditure Sep 2026                  306                    145                       —                     41                       —                   120                       — 
  Jun 2026                  253                    127                       —                     28                       —                     98                       — 
  Sep 2025                  253                    112                      64                      26                       —                     51                       — 
Less: By-product credit Sep 2026                    (6)                    (3)                    (2)                    (1)                     —                      —                      — 
  Jun 2026                    (6)                     (3)                     (2)                     (1)                      —                      —                      — 
  Sep 2025                    (5)                      —                      —                      —                      —                     (5)                      — 
Total All-in-sustaining costs4 Sep 2026              8,203                 3,069                 1,727                 1,426                     486                1,531                     (36)
  Jun 2026               8,099                 2,840                 1,814                 1,478                    559                 1,416                      (8) 
  Sep 2025               7,426                 2,863                 1,825                 1,149                    521                 1,211                  (143) 
Plus: Corporate cost, growth and capital expenditure Sep 2026                  569                       —                      —                      —                      —                   556                      13  
  Jun 2026               1,156                       —                      —                      —                      —                1,125                      31  
  Sep 2025                  795                       —                      —                      —                      —                   782                      13  
Total All-in-costs4 Sep 2026              8,772                 3,069                 1,727                 1,426                     486                2,087                     (23)
  Jun 2026               9,255                 2,840                 1,814                 1,478                    559                 2,541                      23  
  Sep 2025               8,221                 2,863                 1,825                 1,149                    521                 1,993                  (130) 
Gold soldkgSep 2026              4,915                 1,925                     678                    726                    262                1,324                        — 
  Jun 2026               4,936                 1,735                    772                    819                    288                 1,322                       — 
  Sep 2025               5,361                 2,258                    861                    822                    262                 1,158                       — 
 ozSep 2026          158,021               61,890               21,798               23,341                 8,423               42,568                        — 
  Jun 2026          158,696               55,782               24,820               26,331                  9,259              42,503                        — 
  Sep 2025          172,360               72,596               27,682               26,428                  8,423              37,231                        — 
All-in-sustaining cost4R/kgSep 2026       1,668,973          1,594,286          2,547,198          1,964,187          1,854,962          1,156,344                        — 
  Jun 2026       1,640,802          1,636,888          2,349,741          1,804,640          1,940,972          1,071,104                        — 
  Sep 2025       1,385,189          1,267,936          2,119,628          1,397,810          1,988,550          1,045,769                        — 
All-in-sustaining costUS$/ozSep 2026              3,189                 3,046                 4,867                 3,753                 3,544                 2,209                        — 
  Jun 2026               3,097                 3,089                 4,435                 3,406                 3,663                 2,022                       — 
  Sep 2025               2,442                 2,236                 3,737                 2,465                 3,506                 1,844                       — 
All-in-cost4R/kgSep 2026       1,784,741          1,594,286          2,547,198          1,964,187          1,854,962          1,576,284                        — 
  Jun 2026       1,875,000          1,636,888          2,349,741          1,804,640          1,940,972          1,922,088                        — 
  Sep 2025       1,533,483          1,267,936          2,119,628          1,397,810          1,988,550          1,721,071                        — 
All-in-costUS$/ozSep 2026              3,410                 3,046                 4,867                 3,753                 3,544                 3,012                        — 
  Jun 2026               3,539                 3,089                 4,435                 3,406                 3,663                 3,628                       — 
  Sep 2025               2,704                 2,236                 3,737                 2,465                 3,506                 3,035                       — 

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. Cost of sales, before amortisation and depreciation includes all mining and processing costs, third party refining costs, corporate general and administrative costs, and permitting costs
  2. Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
  3. Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current gold production
  4. All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per kilogram (and ounce) and All-in cost per kilogram (and ounce) are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total gold sold over the same period 

ALL-IN COSTS – QUARTERS (continued)

 

Australian operations

Figures are in rand millions unless otherwise stated

Century zinc retreatment operation
    
Cost of sales, before amortisation and depreciation1 Sep 2026                       962  
  Jun 2026                       855  
  Sep 2025                       392  
Royalties Sep 2026                          97  
  Jun 2026                          61  
  Sep 2025                          50  
Community costs Sep 2026                          15  
  Jun 2026                          15  
  Sep 2025                          15  
Inventory change Sep 2026                       (60)
  Jun 2026                       (30) 
  Sep 2025                       425  
Share-based payments2 Sep 2026                          11  
  Jun 2026                          13  
  Sep 2025                            5  
Rehabilitation interest and amortisation3 Sep 2026                          19  
  Jun 2026                          18  
  Sep 2025                          18  
Leases Sep 2026                          13  
  Jun 2026                          11  
  Sep 2025                          24  
Sustaining capital expenditure Sep 2026                          28  
  Jun 2026                            4  
  Sep 2025                          11  
Less: By-product credit Sep 2026                       (61)
  Jun 2026                       (80) 
  Sep 2025                       (70) 
Total All-in-sustaining costs4 Sep 2026                    1,024   
  Jun 2026                       867  
  Sep 2025                       870  
Plus: Corporate cost, growth and capital expenditure Sep 2026                          — 
  Jun 2026                          10  
  Sep 2025                          25  
Total All-in-costs4 Sep 2026                    1,024   
  Jun 2026                       877  
  Sep 2025                       895  
Payable zinc productionktSep 2026                          25  
  Jun 2026                          25  
  Sep 2025                          24  
All-in-sustaining cost4R/tZnSep 2026                  41,022   
  Jun 2026                  35,323   
  Sep 2025                  35,539   
 US$/tZnSep 2026                    2,520   
  Jun 2026                    2,143  
  Sep 2025                    2,015  
All-in-cost4R/tZnSep 2026                  41,022   
  Jun 2026                  35,730   
  Sep 2025                  36,560   
 US$/tZnSep 2026                    2,520   
  Jun 2026                    2,168  
  Sep 2025                    2,073  

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

  1. Cost of sales, before amortisation and depreciation includes all mining and processing costs, corporate general and administrative costs, and permitting costs
  2. Share-based payments are calculated based on the fair value at initial recognition and do not include the adjustment of the cash-settled share-based payment obligation to the reporting date fair value
  3. Rehabilitation includes the interest charge related to the environmental rehabilitation obligation and the amortisation of the related capitalised rehabilitation costs. The interest charge related to the environmental rehabilitation obligation and the amortisation of the capitalised rehabilitation costs reflect the periodic costs of rehabilitation associated with current zinc production
  4. All-in cost is calculated in accordance with the World Gold Council guidance. All-in cost excludes income tax, costs associated with merger and acquisition activities, working capital, impairments, financing costs, one-time severance charges and items needed to normalise earnings. All-in cost is made up of All-in sustaining cost, being the cost to sustain current operations, given as a sub-total in the All-in cost calculation, together with corporate and major capital expenditure associated with growth. All-in sustaining cost per tonne and All-in cost per tonne are calculated by dividing the All-in sustaining cost and All-in cost, respectively, in a period by the total tonnes of payable zinc production in the same period

 

 

UNIT OPERATING COST – QUARTERS

 

US and SA PGM operations

Figures are in rand millions unless otherwise stated

 
   US PGM operationsTotal SA PGM operations2,3Rustenburg3Marikana3Plat Mile3Mimosa
   

Under-

ground1

Total

Under-

ground

Surface

Under-

ground

SurfaceSurfaceAttribu-table
           
Cost of sales, before amortisation and depreciation Sep 20261,25112,399              5,982                     394  5,790                  233                    745  
  Jun 2026               1,415              11,668                  5,325                    354  5,803                  186                    693  
  Sep 2025               1,259              10,919                  5,077                    358  5,257                  227                    926  
Inventory change Sep 2026(90)                  406                    326                      23  57                     —                   (86)
  Jun 2026                (173)                   410                    763                    (56) (297)                     —                   (55) 
  Sep 2025                    67                 1,220                 1,260                    (81) 41                     —                 (229) 
Less: Chrome cost of sales Sep 2026                     —                 (177)                (116)                     — (28)                  (33)                     — 
  Jun 2026                     —                 (155)                 (104)                      — (29)                  (22)                      — 
  Sep 2025                     —                 (306)                 (217)                      — (70)                  (19)                      — 
Less: Purchase cost of PoC Sep 2026                     —                 (801)                     —                      — (801)                     —                      — 
  Jun 2026                     —                 (858)                      —                      — (858)                     —                      — 
  Sep 2025                     —                 (648)                      —                      — (648)                     —                      — 
Total operating cost excluding third party PoC Sep 20261,16111,827              6,192                     417  5,018                  200                    659  
  Jun 2026               1,242              11,065                  5,984                    298  4,619                  164                    638  
  Sep 2025               1,326              11,185                  6,120                    277  4,580                  208                    697  
Tonnes milled/treated ktSep 2026                  177                7,856                 2,757                 1,107                 1,667                     645                1,680                     349  
  Jun 2026                  199                 7,166                 2,535                    876                 1,475                    802                 1,478                    357  
  Sep 2025                  198                 9,973                 3,152                 1,407                 1,760                    960                 2,694                    370  
PGM production excluding third party PoC44EozSep 202659,417412,172          221,878               10,980   173,317              5,997               27,630   
  Jun 2026            69,544             379,009             207,693                  9,460  156,653               5,203              27,397   
  Sep 2025            73,171             464,217             255,126               11,731   188,643               8,717              29,646   
Operating cost5,6R/tSep 2026              6,570                 1,505                 2,246                     377  2,170                  119                1,889   
  Jun 2026               6,255                 1,544                 2,360                    340  2,028                  111                 1,785  
  Sep 2025               6,706                 1,122                 1,942                    197  1,684                    77                 1,881  
 US$/tSep 2026                  404                      92                    138                      23  133                      7                    116  
  Jun 2026                  380                      94                    143                      21  123                      7  108
  Sep 2025                  380                      64                    110                      11  95                      4  107
 R/4Eoz - R/2EozSep 2026            19,540               28,694               27,907               37,978   28,953            33,350               23,851   
  Jun 2026            17,859               29,195               28,812               31,501   29,486            31,520               23,287   
  Sep 2025            18,122               24,094               23,988               23,613   24,279            23,861               23,511   
 US$/4Eoz - US$/2EozSep 2026              1,200                 1,763                 1,714                 2,333   1,778              2,049                 1,465   
  Jun 2026               1,084                 1,772                 1,748                 1,911  1,789               1,913  1,413
  Sep 2025               1,027                 1,366                 1,360                 1,339  1,376               1,353  1,333

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

1    The US PGM operations’ underground production is converted to metric tonnes and kilograms, and performance is translated into Rand

2   Total SA PGM operations exclude the results of Mimosa (financial and production results), which is equity accounted 

3   Cost of sales, before amortisation and depreciation for Total SA PGM operations, Rustenburg, Marikana and Platinum Mile includes the Chrome cost of sales, but is excluded for operating unit cost calculation purposes as Chrome production is excluded from the concentrate production

4   For a reconciliation of the production excluding Mimosa and third party PoC, refer to “Reconciliation of operating cost excluding third party PoC for Total SA PGM operations and Marikana - Quarters”

5   Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation, adjusted for change in inventory, less chrome- and PoC cost of sales in a period by the tonnes milled/treated in the same period, and operating cost per ounce is calculated by dividing the cost of sales, before amortisation and depreciation, adjusted for change in inventory, less chrome- and PoC cost of sales in a period, by the PGM produced in the same period

6  The Section 45X Advance Manufacturing Production Credits relating to US PGM underground operations for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 were R186 million (US$11 million), R228 million(US$14 million) and R181 million (US$10 million) respectively  

UNIT OPERATING COST – QUARTERS (continued)

 

SA gold operations

Figures are in rand millions unless otherwise stated

 
   Total SA gold operationsDriefonteinKloofBeatrixCookeDRDGOLD
   Total

Under-

ground

Surface

Under-

ground

Surface

Under-

ground

Surface

Under-

ground

SurfaceSurfaceSurface
              
Cost of sales, before amortisation and depreciation Sep 2026           7,063              5,075              1,988              2,227                    36             1,599                 112             1,249                    —               457             1,383   
  Jun 2026           6,995             4,913             2,082             2,007                   42             1,596                199             1,310                   —               532             1,309  
  Sep 2025           6,218             4,561             1,657             2,130                   —            1,439                   15                992                   —               489             1,153  
Inventory change Sep 2026              (85)              (70)              (15)            (106)                 —                  32                     9                     4                   —                  (1)              (23)
  Jun 2026            (267)             (211)               (56)               (16)                  —             (106)               (20)               (89)                  —                  (5)               (31) 
  Sep 2025              150                137                   13                (45)                  —                  88                     6                   94                   —               (44)                  51  
Total operating cost Sep 2026           6,978              5,005              1,973              2,121                    36             1,631                 121             1,253                    —               456             1,360   
  Jun 2026           6,728             4,702             2,026             1,991                   42             1,490                179             1,221                   —               527             1,278  
  Sep 2025           6,368             4,698             1,670             2,085                   —            1,527                   21             1,086                   —               445             1,204  
Tonnes milled/treatedktSep 2026           8,354                 729             7,625                 248                   62                180                204                302                   —            1,188              6,170   
  Jun 2026           8,381                721             7,660                271                   62                150                172                300                   —            1,080             6,345  
  Sep 2025           8,408                864             7,544                296                   —               237                   74                332                   —               989             6,481  
Gold producedkgSep 2026           4,835              3,123              1,712              1,794                    71                606                   92                723                   —               242             1,307   
  Jun 2026           4,798             3,066             1,732             1,760                   16                581                110                725                   —               323             1,283  
  Sep 2025           5,472             4,010             1,462             2,263                   —               874                   54                873                   —               217             1,191  
 ozSep 2026      155,449         100,407            55,042            57,678              2,283            19,483              2,958            23,245                    —            7,780            42,021   
  Jun 2026       154,259            98,574            55,685            56,585                 514           18,680              3,537           23,309                    —          10,385            41,249   
  Sep 2025       175,929          128,924            47,004            72,757                    —          28,100              1,736           28,068                    —            6,977           38,292   
Operating cost1,2R/tSep 2026              835             6,861                 259             8,562                 577             9,068                 593             4,150                    —               384                220  
  Jun 2026              803             6,522                265             7,353                673             9,914             1,040             4,072                   —               488                201  
  Sep 2025              757             5,435                221             7,055                   —            6,435                282             3,276                   —               450                186  
 US$/tSep 2026                 51                421                   16                526                   35                557                   36                255                   —                  24                   14  
  Jun 2026                 49                396                   16                446                   41                602                   63                247                   —                  30                   12  
  Sep 2025                 43                308                   13                400                   —               365                   16                186                   —                  26  11
 R/kgSep 2026   1,443,226      1,602,626      1,152,453      1,182,274         507,042      2,691,419      1,315,217      1,733,057                    —    1,884,298   1,040,551
  Jun 2026   1,402,251      1,533,594      1,169,746      1,131,250      2,625,000      2,564,544      1,627,273      1,684,138                    —    1,631,579          996,103   
  Sep 2025   1,163,743      1,171,571      1,142,271          921,343                    —    1,747,140          388,889      1,243,986                    —    2,050,691      1,010,915   
 US$/ozSep 2026           2,757              3,062              2,202              2,259                 969             5,142              2,513              3,311                    —            3,600              1,988   
  Jun 2026           2,647             2,894             2,208             2,135             4,954             4,840             3,071             3,179                   —            3,079             1,880  
  Sep 2025           2,052             2,066             2,014             1,625                   —            3,081                686             2,193                   —            3,616             1,782  

Average exchange rates for the quarters ended 30 September 2026, 30 June 2026 and 30 September 2025 was R16.28/US$, R16.48/US$ and R17.64/US$, respectively

Figures may not add as they are rounded independently

1  Operating cost is the average cost of production and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the tonnes milled/treated in the same period, and operating cost per kilogram (and ounce) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the gold produced in the same period

2  Due to the Kloof operations having a life of 1 year as of 31 December 2025, all capital expenditure is expensed

 

ADJUSTED EBITDA RECONCILIATION – QUARTERS

 
 Quarter ended 30 Sep 2026Quarter ended 30 Jun 2026Quarter ended 30 Sep 2025
 GroupSouthern Africa (SA) regionAmericas regionEuropean (EU) regionAustralian (AUS) regionGroupGroupSouthern Africa (SA) regionAmericas regionEuropean (EU) regionAustralian (AUS) regionGroupGroupSouthern Africa (SA) regionAmericas regionEuropean (EU) regionAustralian (AUS) regionGroup
Figures in million - SA randGroupSA PGMSA goldTotal US operationsUS Under- ground PGMRecyclingTotal EUKeliber OYTotal AUSCentury zinc retreatment operationCorporateGroupSA PGMSA goldTotal US operationsUS Under- ground PGMRecyclingTotal EUKeliber OYTotal AUSCentury zinc retreatment operationCorporateGroupSA PGMSA goldTotal US operationsUS Under- ground PGMRecyclingTotal EUKeliber OYTotal AUSCentury zinc retreatment operationCorporate
Profit/(loss) before royalties, carbon tax and tax7,0754,4632,844299(285)584(615)(227)753788(669)10,7276,6013,6591,232(242)1,474(410)(158)195227(550)4,9943,4532,05218(193)211(419)(91)365399(475)
Adjusted for:     —          —                
Amortisation and depreciation2,5251,1897545654818416161——2,2331,1117363752751005576(1)2,5921,1721,0193983475133———
Interest income(386)(196)(162)(56)(29)(27)3737(4)(4)(5)(366)(169)(183)(44)(25)(19)4343(6)(5)(7)(316)(93)(133)(11)(10)(1)(14)(14)(2)(2)(63)
Finance expense1,10514023027926811261937323931,11815224039738512(37)(44)34313321,2652012524534421125225551279
Share-based payments5041881201029210642227273(187)(58)(33)(61)(59)(2)(26)(8)(8)(8)(1)72826817715814711942326265
Loss/(gain) on financial instruments6453(82)(8)—(8)——101101—(111)14120(475)—(475)125859393127576655780—8026—2828—
(Gain)/loss on foreign exchange movements(23)(32)12(2)(2)—8(14)(7)(6)(2)(55)(55)(118)181087042181812(11)27(54)1486(18)110810
Share of results of equity-accounted investees after tax(56)(27)(36)45(1)————3(990)(805)(190)27(5)————3(251)(157)(103)25(3)————7
Change in estimate of environmental rehabilitation obligation, and right of recovery liability and asset(229)38(265)———————(2)65—(13)—————7882————————————
(Gain)/loss on disposal of property, plant and equipment(42)(40)(7)541—————(29)(17)(17)514—————3245(15)22——————
Impairments1414—————————22————————————————————
Restructuring costs188318(1)(1)—168————6834833—14————2—2————————
Lease payments(67)(26)(17)(2)—(2)(9)(6)(13)(13)—(55)(21)(13)(2)—(2)(9)(6)(10)(11)—(65)(21)(12)(1)—(1)(7)(2)(24)(24)—
Other non-recurring costs101—104747—42———251—54(56)(46)(10)84———(31)145—(11)(59)(169)110113———102
Adjusted EBITDA10,7735,7673,4191,232580652(263)(153)895925(277)12,4716,7584,2901,3943091,085(141)(41)401433(231)9,8724,9613,7311,054579475(197)(58)458486(135)

Non-IFRS measures

Sibanye-Stillwater presents certain non-IFRS figures to provide readers with additional financial information that is regularly reviewed by management to assess the operational performance of the Group and is the responsibility of the Group's Board of Directors. These non-IFRS measures should not be considered as alternatives to IFRS Accounting Standards measures, including cost of sales, net operating profit, profit before taxation, cash from operating activities or any other measure of financial performance presented in accordance with IFRS Accounting Standards, and may not be comparable to similarly titled measures of other companies.

The non-IFRS financial measures discussed in this document are listed below: 

Non-IFRS measureDefinition  Purpose why these non-IFRS measures are reportedReconciled on page
    
Adjusted EBITDAAdjusted earnings before interest, tax, depreciation and amortisation, and is reported based on the formula included in Sibanye-Stillwater’s facility agreements for compliance with the debt covenant formula and involves eliminating the effects of various one-time, irregular, and non-recurring items from the standard EBITDA calculationUsed in the calculation of the debt covenant ratio: net debt/(cash) to adjusted EBITDA 17
All-in sustaining costs (AISC)Cost of sales before amortisation and depreciation plus additional costs which include community costs, inventory change (PGM operations only), share-based payments, royalties, carbon tax, rehabilitation, leases, ore reserve development (ORD), sustaining capital expenditure and deducting the by-product creditDeveloped by the World Gold council for the purpose of the gold mining industry, AISC provides metrics and aims to reflect the full cost to sustain the production and sale of our commodities, and reporting this metric allows for a meaningful comparisons across our operations and different mining companies 11,12,13,14
All-in costs (AIC)AISC plus additional costs relating to corporate and major capital expenditure associated with growthDeveloped by the World Gold council for the purpose of the gold mining industry, AIC provides metrics and aims to reflect the full cost to sustain the production and sale of our commodities, after including growth capital, and reporting this metric allows for a meaningful comparisons across our operations and different mining companies11,12,13,14
AISC/AIC per unit  AISC/AIC divided by the total PGM produced/gold sold/zinc produced (payable)Developed by the World Gold council for the purpose of the gold mining industry, AISC/AIC per unit provides a metric that aims to reflect the full cost to sustain the production and sale, after including growth capital (AIC), of an ounce/kilogram/tonne of commodity and reporting this metric allows for a meaningful comparisons across our operations and different mining companies11,12,13,14
Operating costsThe average cost of production, and operating cost per tonne is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the tonnes milled/treated in the same period, and operating cost per ounce (and kilograms) is calculated by dividing the cost of sales, before amortisation and depreciation and change in inventory in a period by the gold kilograms produced or PGM 2E and 4E ounces produced in the same periodReport a measure that aims to reflect the operating cost to produce our commodities, and reporting this metric allows for a meaningful comparisons across our operations and different mining companies12,15,16

Pro-forma financial information

Certain financial information, including non-IFRS measures, presented in this operating update constitutes pro forma financial information. The responsibility for preparing and presenting the pro forma financial information for the completeness and accuracy of the pro forma financial information is that of the directors of Sibanye-Stillwater. This pro forma financial information is presented for illustrative purposes only. Because of its nature, the pro forma financial information may not fairly present Sibanye-Stillwater’s financial position, changes in equity, and results of operations or cash flows. This pro forma financial information has not been audited or reviewed or otherwise reported on by Sibanye-Stillwater’s external auditor.

ADMINISTRATION AND CORPORATE INFORMATION

 

SIBANYE STILLWATER LIMITED

(SIBANYE-STILLWATER)

Incorporated in the Republic of South Africa

Registration number 2014/243852/06 

Share code: SSW and SBSW

Issuer code: SSW 

ISIN: ZAE000259701

LISTINGS 

JSE: SSW

A2X: SSW

NYSE: SBSW

WEBSITE

www.sibanyestillwater.com

REGISTERED AND CORPORATE OFFICE

Constantia Office Park

Bridgeview House, Building 11, Ground floor

Cnr 14th Avenue & Hendrik Potgieter Road 

Weltevreden Park 1709

South Africa

Private Bag X5 

Westonaria 1780 

South Africa

Tel: +27 11 278 9600

Fax: +27 11 278 9863

COMPANY SECRETARY

Lerato Matlosa

Email: [email protected]

DIRECTORS

Dr Vincent Maphai* (Chairman) 

Dr Richard Stewart (CEO)

Charl Keyter (CFO) 

Dr Elaine Dorward-King*

Harry Kenyon-Slaney*^

Prof Jeremiah Vilakazi#

Dr Lindiwe Mthimunye*  

Keith Rayner# 

Dr Peter Hancock*

Philippe Boisseau*

Richard Menell#

Sindiswa Zilwa* 

Terence Nombembe*  

*    Independent non-executive

#   Non-executive

^   Lead independent director

INVESTOR ENQUIRIES

Please send any investor enquiries to:

[email protected]

JSE SPONSOR

JP Morgan Equities South Africa Proprietary Limited

Registration number 1995/011815/07 

1 Fricker Road, Illovo

Johannesburg 2196 

South Africa

Private Bag X9936 

Sandton 2146 

South Africa

AUDITORS

BDO SOUTH AFRICA INC.

Wanderers Office Park

52 Corlett Drive 

Illovo 2196 

South Africa

Private Bag X60500 

Houghton 2041 

South Africa

Tel: +27 11 488 1700

AMERICAN DEPOSITARY RECEIPTS

TRANSFER AGENT

BNY Mellon Shareowner Correspondence (ADSs)

Mailing address of agent: 

BNY Shareowner Services

PO Box 43006

Providence, RI 02940

United States of America

US toll free: + 1 888 269 2377

Tel: +1 201 680 6825

Email: [email protected]

BNY Depositary Receipts Client Service Management

Tel: +1 212 815 4836

Email: [email protected]

TRANSFER SECRETARIES SOUTH AFRICA

Computershare Investor Services Proprietary Limited

Rosebank Towers

15 Biermann Avenue

Rosebank 2196

PO Box 61051

Marshalltown 2107 

South Africa

Tel: +27 11 370 5000

Fax: +27 11 688 5248

In Europe

Swiss Resource Capital AG

Marc Ollinger

[email protected]

www.resource-capital.ch

DISCLAIMER

 

Forward-looking statements

The information in this report may contain forward-looking statements within the meaning of the “safe harbour” provisions of the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements, including, among others, those relating to Sibanye Stillwater Limited’s (Sibanye-Stillwater or the Group) financial positions, business strategies, business prospects, industry forecasts, production and operational guidance, climate and ESG-related targets and metrics, plans and objectives of management for future operations, are necessarily estimates reflecting the best judgment of the senior management and directors of Sibanye-Stillwater and involve a number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these forward-looking statements should be considered in light of various important factors, including those set forth in this report.

All statements other than statements of historical facts included in this report may be forward-looking statements. Forward-looking statements also often use words such as “will”, “would”, “expect”, “forecast”, “potential”, “may”, “could”, “believe”, “aim”, “anticipate”, “target”, “estimate” and words of similar meaning. By their nature, forward-looking statements involve risk and uncertainty because they relate to future events and circumstances and should be considered in light of various important factors, including those set forth in this disclaimer. Readers are cautioned not to place undue reliance on such statements. 

The important factors that could cause Sibanye-Stillwater’s actual results, performance or achievements to differ materially from estimates or projections contained in the forward-looking statements include, without limitation, Sibanye-Stillwater’s future financial position, plans, strategies, objectives, capital expenditures, projected costs and anticipated cost savings, financing plans, debt position and ability to reduce debt leverage; economic, business, political and social conditions in South Africa, Zimbabwe, the United States, Europe and elsewhere; plans and objectives of management for future operations; Sibanye-Stillwater’s ability to obtain the benefits of any streaming arrangements or pipeline financing; the ability of Sibanye-Stillwater to comply with loan and other covenants and restrictions and difficulties in obtaining additional financing or refinancing; Sibanye-Stillwater’s ability to service its bond instruments; changes in assumptions underlying Sibanye-Stillwater’s estimation of its Mineral Resources and Mineral Reserves; any failure of a tailings storage facility; the ability to achieve anticipated efficiencies and other cost savings in connection with, and the ability to successfully integrate, past, ongoing and future acquisitions (including Metallix), as well as at existing operations; the ability of Sibanye-Stillwater to complete any ongoing or future acquisitions; the success of Sibanye-Stillwater’s business strategy and exploration and development activities, including any proposed, anticipated or planned expansions into the battery metals or adjacent sectors and estimations or expectations of enterprise value; the ability of Sibanye-Stillwater to comply with requirements that it operate in ways that provide progressive benefits to affected communities; changes in the market price of gold, silver, PGMs, battery metals (e.g., nickel, lithium, copper and zinc) and the cost of power, petroleum fuels, and oil, among other commodities and supply requirements; the occurrence of hazards associated with underground and surface mining; any further downgrade of South Africa’s credit rating; a challenge regarding the title to any of Sibanye-Stillwater’s properties by claimants to land under restitution and other legislation; Sibanye-Stillwater’s ability to implement its strategy and any changes thereto; the outcome of legal challenges to the Group’s mining or other land use rights; the occurrence of labour disputes, disruptions and industrial actions; the availability, terms and deployment of capital or credit; changes in the imposition of industry standards, regulatory costs and relevant government regulations, particularly environmental, sustainability, tax, health and safety regulations and new legislation affecting water, mining, mineral rights and business ownership, including any interpretation thereof which may be subject to dispute; the outcome and consequence of any potential or pending litigation or regulatory proceedings, including in relation to any environmental, health or safety issues; failure to meet ethical standards, including actual or alleged instances of fraud, bribery or corruption; the effect of climate change or other extreme weather events on Sibanye-Stillwater’s business; the concentration of all final refining activity and a large portion of Sibanye-Stillwater’s PGM sales from mine production in the United States with one entity; the identification of a material weakness in disclosure and internal controls over financial reporting; the effect of US tax reform legislation on Sibanye-Stillwater and its subsidiaries; the effect of South African Exchange Control Regulations on Sibanye-Stillwater’s financial flexibility; operating in new geographies and regulatory environments where Sibanye-Stillwater has no previous experience; power disruptions, constraints and cost increases; supply chain disruptions and shortages and increases in the price of production inputs; the regional concentration of Sibanye-Stillwater’s operations; fluctuations in exchange rates, currency devaluations, inflation and other macro-economic monetary policies; the occurrence of temporary stoppages or precautionary suspension of operations at its mines for safety or environmental incidents (including natural disasters) and unplanned maintenance; Sibanye-Stillwater’s ability to hire and retain senior management and employees with sufficient technical and/or production skills across its global operations necessary to meet its labour recruitment and retention goals, as well as its ability to achieve sufficient representation of historically disadvantaged South Africans in its management positions, or maintain required board gender diversity; failure of Sibanye-Stillwater’s information technology, communications and systems, evolving cyber threats to Sibanye-Stillwater's operations and the impact of cybersecurity incidents or breaches; the adequacy of Sibanye-Stillwater’s insurance coverage; social unrest, sickness or natural or man-made disaster in surrounding mining communities, including informal settlements in the vicinity of some of Sibanye-Stillwater’s South African-based operations; and the impact of contagious diseases, including global pandemics.

Further details of potential risks and uncertainties affecting Sibanye-Stillwater are described in Sibanye-Stillwater’s filings with the Johannesburg Stock Exchange and the United States Securities and Exchange Commission, including the 2025 Integrated Report and the Annual Financial Report for the fiscal year ended 31 December 2025 on Form 20-F filed with the United States Securities and Exchange Commission on 24 April 2026 (SEC File no. 333-234096).

These forward-looking statements speak only as of the date of the content. Sibanye-Stillwater expressly disclaims any obligation or undertaking to update or revise any forward-looking statement (except to the extent legally required). These forward-looking statements have not been reviewed or reported on by the Group’s external auditors.

Non-IFRS1 measures

The information contained in this report may contain certain non-IFRS measures, including, among others, adjusted EBITDA, AISC, AIC and operating cost. These measures may not be comparable to similarly-titled measures used by other companies and are not measures of Sibanye-Stillwater’s financial performance under IFRS Accounting Standards. These measures should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS Accounting Standards. Sibanye-Stillwater is not providing a reconciliation of the forecast non-IFRS financial information presented in this report because it is unable to provide this reconciliation without unreasonable effort. These forecast non-IFRS financial information presented have not been reviewed or reported on by the Group’s external auditors.

1  IFRS refers to International Financial Reporting Standards Accounting Standards (IFRS Accounting Standards) as issued by the International Accounting Standards Board (IASB)