Commodity-TV

The whole world of commodities in one App!

Watch Management & Expert Interviews, Site-Visit-Videos, News Shows and receive top and up to date Mining Information on your mobile device worldwide!

Download our unique App for free!
Commodity-TV Play Store
Commodity-TV App Store
Commodity-TV

Social Media


Skeena Intersects 19.73 g/t AuEq over 17.00 m in HW Zone at Eskay Creek

Receive up-to-date information about the company directly via push notification

Vancouver, BC (November 21, 2019) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to announce additional gold-silver drill results from the ongoing Phase I surface drilling program at the Eskay Creek Project (“Eskay Creek”) located in the Golden Triangle of British Columbia. Three surface drill rigs are being used for the 2019 Phase I program in the 21A, 21E and HW Zones to infill and upgrade areas of Inferred resources to the Indicated classification. Drill hole results reported in this release are from the 21A, 21E and HW Zones and the new Lower Mudstone horizon. Reference images are presented at the end of this release as well as on the Company’s website.

Phase I Eskay Creek Drilling Highlights

  • 9.14 g/t Au, 348 g/t Ag (13.78 g/t AuEq) over 9.80 metres (SK-19-070)
    • Including: 21.40 g/t Au, 706 g/t Ag (30.81 g/t AuEq) over 0.50 metres
  • 6.12 g/t Au, 72 g/t Ag (7.08 g/t AuEq) over 15.81 metres (SK-19-099)
    • Including: 36.90 g/t Au, 34 g/t Ag (37.35 g/t AuEq) over 1.50 metres
  • 9.91 g/t Au, 737 g/t Ag (19.73 g/t AuEq) over 17.00 metres (SK-19-139)
    • Including: 171.50 g/t Au, 12,320 g/t Ag (335.77 g/t AuEq) over 0.83 metres

 

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. Reported core lengths represent 80-100% of true widths and are supported by well-defined mineralization geometries derived from historical drilling. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were nulled to a value of zero.

 

Initial HW Zone Drilling Intersects Broad High-Grade Mineralization
The first Phase I drill hole into the Hanging Wall (HW) Zone (SK-19-139), intersected a wider than predicted interval grading 9.91 g/t Au, 737 g/t Ag (19.73 g/t AuEq) over 17 m that has expanded the originally projected inferred mineralization. This also included a subinterval containing abundant visible gold and electrum grading 171.50 g/t Au, 12,320 g/t Ag (335.77 g/t AuEq) over 0.83 m. The HW Zone occurs approximately 20 m stratigraphically above the Contact Mudstone which was host to the 21B Zone deposits at Eskay Creek. Precious metal mineralization in this near surface HW Zone is uncommon at Eskay Creek, which is usually characterized by elevated base metals (Cu-Pb-Zn). The HW Zone is believed to represent a reactivated synvolcanic fault which crosscuts the andesitic cap rocks of the Eskay stratigraphy (refer to attached stratigraphic section).

Lower Mudstone Horizon Continues to Develop
Continued drill testing of the Lower Mudstone unit has again intersected additional mineralization below the 21A Zone. Drill hole SK-19-068 intersected a wide interval of Lower Mudstone with mineralization averaging 7.52 g/t Au, 11 g/t Ag (7.66 g/t AuEq) over 3.70 m including 17.05 g/t Au, 18 g/t Ag (17.29 g/t AuEq) over 1.00 m. This interval occurs approximately 30 m north of previously reported drill hole SK-19-063, which averaged 312.81 g/t Au, 95 g/t Ag (314.07 g/t AuEq) over 2.21 m including an individual sample with considerable visible gold grading 1,380 g/t Au, 322 g/t Ag (1,384.29 g/t AuEq) over 0.50 m.

A portion of the 21A Zone infill drill holes have been extended below the resources to test the exploration potential of this secondary and less explored mineralized mudstone horizon. The Lower Mudstone is situated approximately 100 m stratigraphically below the more familiar Contact Mudstone, host to the previously developed Eskay Creek deposits (see attached sections).

The Lower Mudstone is regionally extensive and averages 5 to 15 m in true thickness. It’s situated approximately 100 metres below the Eskay Creek deposits and has been traced by historical drilling for over 5,000 m along strike. Typical of bimodal volcanic sequences hosting Volcanic Hosted Massive Sulphide (VHMS) deposits, the mudstone represents a period of mineralizing and sedimentation quiescence between the underlying volcanic rocks of the Mount Dilworth Formation (~190 Ma), and the stratigraphically younger Eskay Creek Mine stratigraphy hosted in the Salmon River Formation (~175 Ma). The Lower Mudstone is essentially analogous (contemporaneous) to the main Contact Mudstone in that it occurs at a mineralized time-break between periods of volcanic activity. The stratigraphic and mineralization cyclicity within a volcanic pile is a common feature to VHMS deposits of which Eskay Creek is a member.

Ongoing Infill Drilling Produces Expected Results
Phase I infill drilling within the 21A and 21E Zones continues to confirm the predicted inferred mineralization with the aim of increasing the resource confidence in these areas. Three drill holes, SK-19-106, SK-19-107 and SK-19-108 were drilled to aggressively test for an up-dip extension to the 21E Zone. Significant mineralization was not intersected however the holes provided important stratigraphic and structural information.  

About Skeena
Skeena Resources Limited is a junior Canadian mining exploration company focused on developing prospective precious and base metal properties in the Golden Triangle of northwest British Columbia, Canada. The Company’s primary activities are the exploration and development of the past-producing Eskay Creek and Snip mines. In addition, the Company has completed a Preliminary Economic Assessment on the GJ copper-gold porphyry project.

On behalf of the Board of Directors of Skeena Resources Limited,



Walter Coles Jr.
President & CEO

 

Qualified Persons
Exploration activities at the Eskay Creek Project are administered on site by the Company’s Exploration Managers, Colin Russell, P.Geo. and Adrian Newton, P.Geo. In accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration and Resource Development, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on its exploration projects.

Quality Assurance – Quality Control
Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently securely stored on site. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company’s Qualified Person, Paul Geddes, P.Geo, Vice President Exploration and Resource Development.

Drill core samples are submitted to ALS Geochemistry’s analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 1kg is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100ppm are re-analyzed using a 50g fire assay fusion with gravimetric finish. Analysis for silver is by 50g fire assay fusion with gravimetric finish with a lower limit of 5ppm and upper limit of 10,000ppm. Samples with silver assays greater than 10,000ppm are re-analyzed using a gravimetric silver concentrate method. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) and also for mercury using an aqua regia digest with Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) finish. Samples with sulfur reporting greater than 10% from the multi-element analysis are re-analyzed for total sulfur by Leco furnace and infrared spectroscopy.

Cautionary note regarding forward-looking statements
Certain statements made and information contained herein may constitute “forward looking information” and “forward looking statements” within the meaning of applicable Canadian and United States securities legislation. These statements and information are based on facts currently available to the Company and there is no assurance that actual results will meet management’s expectations.  Forward-looking statements and information may be identified by such terms as “anticipates”, “believes”, “targets”, “estimates”, “plans”, “expects”, “may”, “will”, “could” or “would”.  Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters.  While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.

Neither TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.

In Europe:
Swiss Resource Capital AG
Jochen Staiger
[email protected]www.resource-capital.ch

 

Table 1: Eskay Creek Project Phase I 21A Zone length weighted drill hole gold and silver composites:

 

HOLE-ID

FROM (M)

TO (M)

CORE LENGTH (M)

AU (G/T)

 AG (G/T)

AUEQ (G/T)

AREA

SK-19-062

       24.00

       50.00

       26.00

         0.98

                84

                   2.09

21E

INCLUDING

       45.92

       46.42

         0.50

         4.65

          2,240

                 34.52

21E

AND

       46.42

       47.50

         1.08

         2.67

             549

                   9.99

21E

SK-19-068

       12.50

       14.00

         1.50

         0.73

                62

                   1.56

21A

SK-19-068

     102.00

     105.70

         3.70

         7.52

                11

                   7.66

LMS

INCLUDING

     104.00

     105.00

         1.00

       17.05

                18

                 17.29

LMS

SK-19-069

       12.41

       13.12

         0.71

         1.61

                21

                   1.89

21A

SK-19-069

     106.22

     111.23

         5.01

         2.45

                15

                   2.65

LMS

SK-19-070

         8.20

       18.00

         9.80

         9.14

             348

                 13.78

21E

INCLUDING

         8.20

         9.00

         0.80

       20.00

          1,945

                 45.93

21E

AND

       10.66

       11.50

         0.84

       10.60

                25

                 10.93

21E

AND

       11.50

       12.40

         0.90

       11.80

                22

                 12.09

21E

AND

       12.40

       13.10

         0.70

         1.97

             714

                 11.49

21E

AND

       13.10

       13.90

         0.80

         8.11

             248

                 11.42

21E

AND

       13.90

       14.55

         0.65

       12.50

                25

                 12.83

21E

AND

       16.00

       16.50

         0.50

       21.40

             706

                 30.81

21E

AND

       16.50

       17.34

         0.84

         8.48

             422

                 14.11

21E

SK-19-070

       28.08

       66.50

       38.42

         1.30

                23

                   1.61

21E

SK-19-071

         9.47

       16.00

         6.53

         9.58

             569

                 17.18

21E

INCLUDING

         9.47

       10.00

         0.53

       52.00

                67

                 52.89

21E

AND

       10.00

       11.00

         1.00

         2.91

          2,120

                 31.18

21E

AND

       11.00

       11.80

         0.80

         4.08

             484

                 10.53

21E

AND

       11.80

       12.40

         0.60

       14.30

                38

                 14.81

21E

AND

       12.40

       13.00

         0.60

         8.01

                15

                   8.21

21E

AND

       13.00

       13.60

         0.60

         9.68

                23

                   9.99

21E

AND

       13.60

       14.55

         0.95

         7.31

             647

                 15.94

21E

AND

       14.55

       16.00

         1.45

         1.87

             355

                   6.60

21E

SK-19-071

       25.11

       47.00

       21.89

         1.91

                63

                   2.74

21E

SK-19-072

         8.30

       15.17

         6.87

         8.78

             101

                 10.12

21E

INCLUDING

         8.30

         9.50

         1.20

       14.00

                28

                 14.37

21E

AND

       12.30

       13.00

         0.70

       22.40

                21

                 22.68

21E

SK-19-072

       25.80

       42.40

       16.60

         1.99

                34

                   2.45

21E

SK-19-073

       28.73

       58.00

       29.27

         0.98

                23

                   1.29

21E

SK-19-074

       16.10

       17.00

         0.90

         1.02

                  5

                   1.09

21E

SK-19-074

       17.50

       18.00

         0.50

         1.47

<5

                   1.47

21E

SK-19-074

       26.03

       41.05

       15.02

         1.28

                50

                   1.95

21E

SK-19-075

       27.85

       52.80

       24.95

         2.10

                38

                   2.61

21E

SK-19-076

       20.72

       39.78

       19.06

         0.82

                57

                   1.58

21E

SK-19-077

       12.00

       16.42

         4.42

         5.52

                52

                   6.22

21E

INCLUDING

       14.60

       15.27

         0.67

       15.55

             121

                 17.16

21E

AND

       15.27

       15.80

         0.53

       12.10

                33

                 12.54

21E

SK-19-078

       29.38

       41.00

       11.62

         3.55

                46

                   4.16

21E

INCLUDING

       32.20

       32.70

         0.50

       10.55

                30

                 10.95

21E

AND

       32.70

       33.40

         0.70

         8.17

                23

                   8.48

21E

SK-19-079

       24.31

       52.00

       27.69

         1.46

                41

                   2.01

21E

SK-19-080

       10.00

       41.50

       31.50

         0.93

                35

                   1.39

21A

SK-19-081

         3.00

       65.00

       62.00

         1.70

                40

                   2.24

21A

INCLUDING

       21.33

       22.00

         0.67

       35.30

          1,625

                 56.97

21A

SK-19-082

         6.00

       41.00

       35.00

         1.30

                11

                   1.44

21A

SK-19-083

       29.00

       51.00

       22.00

         1.01

                11

                   1.16

21A

SK-19-084

       22.00

       55.50

       33.50

         1.51

                22

                   1.80

21E

SK-19-085

     

 ABANDONED

21E

SK-19-085A

       21.30

       44.40

       23.10

         2.18

                42

                   2.75

21E

SK-19-086

         6.00

         7.40

         1.40

         0.93

                30

                   1.33

21A

SK-19-086

       38.95

       40.34

         1.39

         1.04

<5

                   1.04

21A

SK-19-087

     

 NSA

21A

SK-19-088

       28.50

       30.00

         1.50

         0.75

             113

                   2.26

21A

SK-19-089

       14.00

       15.09

         1.09

         1.09

<5

                   1.09

21A

SK-19-090

       29.00

       30.00

         1.00

         0.67

                  9

                   0.79

21A

SK-19-091

     

 ASSAYS PENDING

 

SK-19-092

         5.00

         5.59

         0.59

         2.22

                13

                   2.39

21A

SK-19-092

       23.00

       43.50

       20.50

         0.86

                18

                   1.10

21A

SK-19-093

         1.15

       36.50

       35.35

         1.30

                19

                   1.55

21A

SK-19-094

     

 ASSAYS PENDING

 

SK-19-095

     

 ASSAYS PENDING

 

SK-19-096

     

 ASSAYS PENDING

 

SK-19-097

     

 ASSAYS PENDING

 

SK-19-098

       11.90

       20.50

         8.60

         1.50

                44

                   2.09

21A

SK-19-099

       17.69

       33.50

       15.81

         6.12

                72

                   7.08

21A

INCLUDING

       25.00

       25.50

         0.50

       10.60

             143

                 12.51

21A

AND

       25.50

       26.00

         0.50

       19.35

             105

                 20.75

21A

AND

       26.00

       27.50

         1.50

       36.90

                34

                 37.35

21A

SK-19-100

     

 ASSAYS PENDING

 

SK-19-101

       22.16

       22.70

         0.54

         1.28

<5

                   1.28

21A

SK-19-102

       36.33

       46.33

       10.00

         1.23

             207

                   3.99

21E

INCLUDING

       41.00

       41.66

         0.66

         2.28

          1,045

                 16.21

21E

AND

       41.66

       42.50

         0.84

         2.00

          1,410

                 20.80

21E

SK-19-103

       38.00

       55.00

       17.00

         0.92

             127

                   2.62

21E

INCLUDING

       51.00

       51.50

         0.50

         2.72

          2,640

                 37.92

21E

SK-19-104

       39.75

       48.00

         8.25

         0.99

                20

                   1.26

21E

SK-19-105

       32.30

       39.60

         7.30

         1.09

                29

                   1.47

21E

SK-19-106

     

 NSA

21E

SK-19-107

     

 NSA

21E

SK-19-108

     

 NSA

21E

SK-19-109

       27.00

       57.50

       30.50

         1.50

                23

                   1.81

21E

SK-19-110

     

 ASSAYS PENDING

 

SK-19-111

       24.45

       72.10

       47.65

         1.42

                26

                   1.77

21E

SK-19-112

       24.02

       59.00

       34.98

         1.86

                21

                   2.14

21E

SK-19-113

     

 ASSAYS PENDING

 

SK-19-114

     

 ASSAYS PENDING

 

SK-19-115

       18.54

       22.75

         4.21

         0.84

             160

                   2.98

21E

SK-19-116

       14.00

       19.00

         5.00

         2.36

                11

                   2.51

21E

SK-19-117

       18.57

       22.59

         4.02

         1.47

                18

                   1.71

21E

SK-19-118

     

 ASSAYS PENDING

 

SK-19-119

     

 ASSAYS PENDING

 

SK-19-120

       13.00

       18.10

         5.10

         1.05

                15

                   1.26

21E

SK-19-121

       18.00

       19.00

         1.00

         0.41

                53

                   1.12

21E

SK-19-121

       35.18

       36.00

         0.82

         5.71

             184

                   8.16

21E

SK-19-122

       23.08

       57.00

       33.92

         1.38

                82

                   2.47

21E

INCLUDING

       23.08

       24.00

         0.92

       10.05

          1,060

                 24.18

21E

AND

       24.00

       25.00

         1.00

         6.56

             848

                 17.87

21E

SK-19-123

       16.95

       37.00

       20.05

         2.08

                91

                   3.30

21E

SK-19-124

       18.90

       21.20

         2.30

         1.78

             196

                   4.39

21E

SK-19-125

       29.00

       34.00

         5.00

         1.04

                19

                   1.29

21E

SK-19-126

       19.40

       20.40

         1.00

         1.18

                  7

                   1.27

21E

SK-19-126

       31.30

       33.15

         1.85

         1.07

                14

                   1.26

21E

SK-19-127

     

 ASSAYS PENDING

 

SK-19-128

     

 ASSAYS PENDING

 

SK-19-129

       25.00

       26.50

         1.50

         0.73

                  6

                   0.81

21E

SK-19-130

     

 ASSAYS PENDING

 

SK-19-131

     

 NSA

21E

SK-19-132

     

 ASSAYS PENDING

 

SK-19-133

     

 ASSAYS PENDING

 

SK-19-134

     

 ASSAYS PENDING

 

SK-19-135

     

 ASSAYS PENDING

 

SK-19-136

     

 ASSAYS PENDING

 

SK-19-137

     

 ASSAYS PENDING

 

SK-19-138

     

 ASSAYS PENDING

 

SK-19-139

         2.10

         3.45

         1.35

         5.36

             479

                 11.74

HW

SK-19-139

       15.00

       32.00

       17.00

         9.91

             737

                 19.73

HW

INCLUDING

       27.92

       28.75

         0.83

     171.50

        12,320

              335.77

HW

Gold Equivalent (AuEq) calculated via the formula: Au (g/t) + [Ag (g/t) / 75]. Reported core lengths represent 80-100% of true widths and are supported by well-defined mineralization geometries derived from historical drilling. Length weighted AuEq composites were constrained by geological considerations. Grade capping of individual assays has not been applied to the Au and Ag assays informing the length weighted AuEq composites. Processing recoveries have not been applied to the AuEq calculation and are disclosed at 100%. Samples below detection limit were nulled to a value of zero. LMS – Lower Mudstone.  NSA – No Significant Assays.

Table 2: Mine grid Phase I drill hole locations and orientations:

HOLE-ID

EASTING

NORTHING

ELEVATION

LENGTH (M)

AZIMUTH

DIP

SK-19-062

10075.2

10352.9

980.0

50.0

101.5

-55.9

SK-19-068

9921.7

10040.9

990.6

140.1

109.2

-89.0

SK-19-069

9921.7

10040.9

990.6

150.0

137.6

-83.0

SK-19-070

10080.1

10411.7

970.9

70.0

102.0

-72.4

SK-19-071

10080.1

10411.7

970.9

65.0

80.4

-88.5

SK-19-072

10080.1

10411.7

970.9

55.0

75.2

-71.9

SK-19-073

10066.2

10418.0

967.1

61.0

54.3

-84.6

SK-19-074

10066.2

10418.0

967.1

55.0

157.3

-76.4

SK-19-075

10062.4

10428.1

961.7

61.0

61.5

-60.0

SK-19-076

10105.7

10432.3

980.3

55.0

47.0

-84.2

SK-19-077

10105.7

10432.3

980.3

35.0

271.1

-65.3

SK-19-078

10105.7

10432.3

980.3

41.0

209.9

-48.6

SK-19-079

10105.7

10432.3

980.3

52.0

172.7

-67.7

SK-19-080

9891.3

9868.1

1008.5

56.0

28.7

-89.5

SK-19-081

9891.3

9868.1

1008.5

65.0

312.8

-73.9

SK-19-082

9891.3

9868.1

1008.5

45.0

217.1

-54.8

SK-19-083

9905.7

9883.8

998.8

55.6

306.0

-53.8

SK-19-084

10070.0

10387.0

975.6

67.0

77.0

-60.2

SK-19-085

10070.0

10387.0

975.6

50.0

0.0

-90.0

SK-19-085A

10070.0

10387.0

974.8

50.0

0.0

-90.0

SK-19-086

9905.7

9883.8

998.8

60.0

270.4

-71.9

SK-19-087

9905.7

9883.8

998.8

61.0

89.8

-78.7

SK-19-088

9916.0

9905.0

986.3

45.0

241.9

-54.0

SK-19-089

9916.0

9905.0

986.3

40.0

314.8

-64.4

SK-19-090

9916.0

9905.0

986.3

45.0

288.7

-47.8

SK-19-092

9884.9

9929.4

1011.9

60.0

180.7

-72.1

SK-19-093

9884.9

9929.4

1011.9

65.0

92.6

-77.3

SK-19-098

9956.8

10115.2

980.5

42.0

167.2

-63.5

SK-19-099

9956.8

10115.2

980.5

42.0

53.9

-64.8

SK-19-101

9973.0

10139.0

972.6

42.0

130.4

-65.5

SK-19-102

10082.0

10339.0

981.0

57.0

111.8

-67.1

SK-19-103

10082.0

10339.0

981.0

55.0

119.2

-89.4

SK-19-104

10075.0

10353.0

980.0

59.0

337.5

-89.4

SK-19-105

10075.0

10353.0

980.0

62.0

109.0

-71.7

SK-19-106

10169.0

10373.0

989.0

40.0

338.7

-60.5

SK-19-107

10169.0

10373.0

989.0

35.0

316.0

-89.1

SK-19-108

10169.0

10373.0

989.0

39.0

198.1

-50.2

SK-19-109

10070.0

10374.0

973.0

71.0

71.4

-66.2

SK-19-111

10093.2

10377.8

986.6

73.0

20.9

-68.7

SK-19-112

10093.0

10378.0

987.0

70.0

22.1

-80.6

SK-19-115

10108.5

10449.8

976.9

55.0

125.9

-78.8

SK-19-116

10108.5

10449.8

976.9

26.0

217.3

-51.7

SK-19-117

10108.5

10449.8

976.9

64.0

32.7

-80.3

SK-19-120

10112.0

10463.6

972.9

35.0

115.8

-72.3

SK-19-121

10112.0

10463.6

972.9

36.0

68.8

-50.1

SK-19-122

10112.0

10463.6

972.9

59.0

265.8

-82.8

SK-19-123

10097.0

10475.0

963.0

37.0

204.6

-69.2

SK-19-124

10097.0

10475.0

963.0

50.0

108.9

-78.3

SK-19-125

10097.0

10475.4

962.8

50.0

294.7

-74.4

SK-19-126

10092.0

10492.0

957.0

46.0

210.8

-83.5

SK-19-129

10086.0

10527.0

941.0

41.0

210.8

-76.6

SK-19-131

10086.0

10527.0

941.0

40.0

88.1

-51.2

SK-19-139

9931.0

10869.0

873.9

32.0

274.1

-50.0

 

 

 

 

Always up to date with the newsletter from SRC

Swiss Resource Capital AG will use the information you provide in this form to keep in touch with you and to provide you with updates and marketing information. To receive our news, you still have to give us permission to send you E-Mails below.

You can change your mind at any time by clicking on the Unsubscribe link, which you can find in the footer of every email you receive from us, or by contacting us at [email protected] We will treat your information with care and respect. For more information about our privacy practices, visit our website. By clicking below, you agree that we may process your information in accordance with these Terms.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

* indicates required
SRC Mining & Special Situations ZertifikatSRC Mining & Special Situations Zertifikat

Always up to date with the newsletter from SRC

Swiss Resource Capital AG will use the information you provide in this form to keep in touch with you and to provide you with updates and marketing information. To receive our news, you still have to give us permission to send you E-Mails below.

You can change your mind at any time by clicking on the Unsubscribe link, which you can find in the footer of every email you receive from us, or by contacting us at [email protected] We will treat your information with care and respect. For more information about our privacy practices, visit our website. By clicking below, you agree that we may process your information in accordance with these Terms.

We use Mailchimp as our marketing platform. By clicking below to subscribe, you acknowledge that your information will be transferred to Mailchimp for processing. Learn more about Mailchimp's privacy practices here.

* indicates required