News about commodities and stocks | Company News | Swiss Resource Capital

GoldMining Intersects 37 Metres Grading 2.26 g/t Gold Within Mineralized Corridor of 163 Metres Grading 1.02 g/t Gold at the São Jorge Project, Brazil

GoldMining Inc.

Figure 1 – Tapajós Gold District and location of São Jorge Project.

Figure 2 – São Jorge gold deposit drill hole locations, including location of SJD-120-24 and other drill holes pending assay results. Section line as illustrated in Figure 3 is shown.

Figure 3 – São Jorge gold deposit drill hole cross-section, showing location of recently completed SJD-120-24, facing northeast (see section trace on Figure 2).

Figure 4 – São Jorge gold mineralization from drillhole SJD-120-24: (A) 11.47 g/t Au from 97.0 to 98.0 m downhole comprising intensely pyrite veined and silicified/brecciated monzogranite; and (B) 3.75 g/t Au from 265.0 to 266.0 m downhole comprising fracture-controlled sulphide veins displaying two principal structural orientations.

Receive up-to-date information about the company directly via push notification

More News
SRC Mining & Special Situations Zertifikat

Newsletter registration

E-mail address
Anmelden
Newsletter / Archiv